[Hallb-engineering] Vacuum

Douglas Tilles tilles at jlab.org
Thu Apr 23 10:17:20 EDT 2015


To All

During the training and the unplugging to put the vacuum controller on the beam line. The system was not reset. Steve had to come in and reset the system we lost 2 hours of beam. We need to make sure this is done in the future and the system is ready for beam.

Doug


More information about the Hallb-engineering mailing list