[Hallb-engineering] Fwd: Torus power-up
burkert
burkert at jlab.org
Tue Oct 11 22:41:44 EDT 2016
Dear all,
Below find the long awaited good news from the Torus magnet front.
Stay tuned!
Volker
-------- Forwarded Message --------
Subject: Torus power-up
Date: Tue, 11 Oct 2016 19:17:42 -0400 (EDT)
From: Cesar Luongo <luongo at jlab.org>
To: Dave Kashy <kashy at jlab.org>, Allison Lung <lung at jlab.org>, Volker
Burkert <burkert at jlab.org>, Glenn Young <gyoung at jlab.org>, Ruben Fair
<rfair at jlab.org>, Pasyuk Eugene <pasyuk at jlab.org>, Latifa Elouadrhiri
<latifa at jlab.org>, Leigh Harwood <harwood at jlab.org>, mont
<mont at jlab.org>, George Biallas <biallas at jlab.org>, Probir Ghoshal
<ghoshal at jlab.org>, Renuka Rajput-Ghoshal <renuka at jlab.org>, rossi
patrizia <rossi at jlab.org>, Javier Gomez <gomez at jlab.org>, Nicholas
Sandoval <sandoval at jlab.org>, Wesley Moore <wmoore at jlab.org>, Christiana
Wilson <grenoble at jlab.org>, Pablo Campero Rojas <campero at jlab.org>,
Brian Eng <beng at jlab.org>, Ramakrishna Bachimanchi <bachiman at jlab.org>,
Tyler Lemon <tlemon at jlab.org>, Scot Spiegel <spiegel at jlab.org>, Krister
Bruhwel <bruhwel at jlab.org>, Douglas Tilles <tilles at jlab.org>, Bob Miller
<rmiller at jlab.org>, Mark Todd <mtodd at jlab.org>, Onish Kumar
<okumar at jlab.org>, Sarin Philip <philip at jlab.org>, David Gelhaar
<gelhaar at jlab.org>
Dear All,
Today, we successfully started the Torus energization phase of commissioning.
We were able to exercise the power supply/magnet system as a whole, first manually, and then through
the EPICS screens. We did a number of pre-checks at 10 A and 20 A, and then executed the first step of
the procedure with ramps to 100 A at different rates, and in both polarities. All I&C systems were fully
operational and the data collected showed expected behavior. There were a few bugs on display screens
in reverse polarity, but the system switched smoothly and without any glitch from + to -
The next step is to ramp to 350 A, exercise the fast dump, and test some of the interlocks. It was a
very successful day that puts us in very solid footing to keep marching towards full current operation.
Thank you Team!
Cesar
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20161011/e36fff99/attachment.html>
More information about the Hallb-engineering
mailing list