Dear all,
Today, December 17, 2017 at 13:13:26, the beam in Hall B was increased
to 70nA. This corresponds to the design operating luminosity of CLAS12.
This is a huge milestone on our way to science in 2018. All baseline
detectors, superconducting magnets, and several ancillary detectors are
installed and were fully operational.
While all detectors behaved as expected, some tuning of their operating
parameters remains to be done for the second part of the engineering run
in January.Until then we all must do our utmost to use the large amount
of data collected during this commissioning run for the calibration of
all detector components.
With the best wishes for a wonderful holiday season,
Volker Burkert
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20171217/45a36b5d/attachment.html>
More information about the Hallb-engineering
mailing list