[Hallb-engineering] Fwd: Torus ramping
Douglas Tilles
tilles at jlab.org
Fri Jan 27 09:26:48 EST 2017
FYI
----- Forwarded Message -----
From: "Probir Ghoshal" <ghoshal at jlab.org>
To: "mcookiv" <mcookiv at jlab.org>, "Tyler Lemon" <tlemon at jlab.org>, "Pablo Campero" <campero at jlab.org>, "Nicholas Sandoval" <sandoval at jlab.org>, "David Gelhaar" <gelhaar at jlab.org>, "Ramakrishna Bachimanchi" <bachiman at jlab.org>
Cc: "Ruben Fair" <rfair at jlab.org>, "George Biallas" <biallas at jlab.org>, "Doug Tilles" <tilles at jlab.org>, "Bob Miller" <rmiller at jlab.org>, "David Kashy" <kashy at jlab.org>, "Joseph Matalevich" <josephm at jlab.org>, "Renuka Rajput-Ghoshal" <renuka at jlab.org>, "Stepan Stepanyan" <stepanya at jlab.org>
Sent: Friday, January 27, 2017 8:53:47 AM
Subject: Re: Torus ramping
Dear All,
We are ready to charge the magnet to test up to 1900 A (1885 A) half the field this morning @930 hrs.
The final check list of environment check is in progress to sweeping the magnet (magnetic materials) - George B.
Once this is complete, we will be changing the magnet from the counting house.
Regards
Probir
PS: Doug - Please ensure all detector guys working to clear the area marked once red flashing beacon is on.
----- Original Message -----
From: "Doug Tilles" <tilles at jlab.org>
To: "Ruben Fair" <rfair at jlab.org>, "Probir Ghoshal" <ghoshal at jlab.org>
Sent: Friday, January 27, 2017 8:15:12 AM
Subject: Torus ramping
When do you plan to do the check list and ramp the Torus to 1900 A
More information about the Hallb-engineering
mailing list