[Hallb-engineering] [New Logentry] Follow-up Re: Follow-up Re: Solenoid Cooldown
kashy at jlab.org
kashy at jlab.org
Mon Sep 4 07:25:02 EDT 2017
Logentry Text:
--
Cooling of the magnet continues.
Coils 1 and 2 are at 97K
Coils 3 and 4 are at 102K
Coil 5 is at 111K
Coils 1 to 4 are still cooling, but slower than coil 5 which is expected at this point in the process.
The Z support load cells have slowed their rate of force increase as expected. the Downstream Beam Left Top load cell (which was highest) dropped from ~520 to ~340 yesterday at about 3pm. At present there is no explanation for this. Maybe there was some compaction of materials in the support link adapters. Similar drops were seen the day before on DS BR T and US BR T load cells
Tuesday, before starting the 4K portion of the cooldown we will stop the flow and reconnect the UPS. In parallel with 4K cooling we need to understand and repair the noise that is being generated by the lead flow heaters.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3483438
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170904/fe55eb9a/attachment.html>
More information about the Hallb-engineering
mailing list