[Hallb-engineering] [New Logentry] Follow-up Re: Follow-up Re: Solenoid/Buffer Dewar Recovery and Torus Status
kashy at jlab.org
kashy at jlab.org
Fri Sep 15 08:30:03 EDT 2017
Logentry Text:
--
Completed tuning of the Solenoid cryo this morning and now helium levels and temps are such that we will start ramping at ~08:30
Vacuum of Torus for past two days is shown in other plot.
Denny and I will come up with a recommended time between Torus Warm Up's/ degassing and then this should be put on a PM plan and scheduled between experiments.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3484504
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170915/961af11a/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20170915_081949.gif
Type: image/gif
Size: 69463 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170915/961af11a/attachment-0003.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20170915_082718.gif
Type: image/gif
Size: 53099 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170915/961af11a/attachment-0004.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20170915_082328.gif
Type: image/gif
Size: 60241 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170915/961af11a/attachment-0005.gif>
More information about the Hallb-engineering
mailing list