[Hallb-engineering] [New Logentry] Hall B Buffer Dewar
kashy at jlab.org
kashy at jlab.org
Thu Sep 28 03:05:02 EDT 2017
Logentry Text:
--
Buffer dewar is filling again. I put the PID values back in from the PID spread sheet including input variables and setpoints then enabled the EV8210, EV8210A and EV8210B PID's
Once we get access to Hall B we should be able to start the Dewar return u-tube cooldown and swap to cold return on the Dewar
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3486143
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170928/dc0ea977/attachment.html>
More information about the Hallb-engineering
mailing list