[Hallb-engineering] [New Logentry] Follow-up Re: Solenoid Cooldown
kashy at jlab.org
kashy at jlab.org
Tue Sep 5 22:25:02 EDT 2017
Logentry Text:
--
Helium level in the lead reservoir has been tuned and should be fine overnight.
Some PLC work may be needed in the morning.
Cooling rate is about 1.5K/hr on the cold mass and 2K/hr on the shield.
Z supports look fine with the maximum being 480lbs on DS BL Top
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3483560