[Hallb-engineering] [New Logentry] Follow-up Re: Solenoid Cooldown
kashy at jlab.org
kashy at jlab.org
Thu Sep 7 10:35:03 EDT 2017
Logentry Text:
--
Both VCL flow controllers on the Solenoid were replaced and are working perfectly. Procurement will be contacted about getting the old ones re-calibrated.
The Superconducting helium level sensors on both the magnet and lead reservoir are not working properly but the Differential Pressure sensors are working. We are trouble shooting the SC probes. Helium now appears to be collecting in the magnet reservoir.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3483719
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170907/8a0ced5e/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20170907_101459.gif
Type: image/gif
Size: 27554 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170907/8a0ced5e/attachment-0006.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20170907_101423.gif
Type: image/gif
Size: 77833 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170907/8a0ced5e/attachment-0007.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20170907_103119.gif
Type: image/gif
Size: 89675 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170907/8a0ced5e/attachment-0008.gif>
More information about the Hallb-engineering
mailing list