[Hallb-engineering] [New Logentry] Follow-up Re: Follow-up Re: Follow-up Re: Solenoid Power-up
Ruben Fair
rfair at jlab.org
Sun Sep 17 08:07:43 EDT 2017
Ok Dave
> On Sep 16, 2017, at 11:45 PM, kashy at jlab.org wrote:
>
> Follow-up Re: Follow-up Re: Follow-up Re: Solenoid Power-up
>
> Lognumber 3484618. Submitted by kashy on Sat, 09/16/2017 - 23:40.
> Logbooks: HBSOLENOID HBTORUS CLOG
> Tags: Hall B
> References: 3484610 - Follow-up Re: Follow-up Re: Solenoid Power-up
> The Torus is now on COLD RETURN and the Helium Reservoir is filling.
> The tune of the Solenoid should be more stable and tolerant of glitches from ESR/CHL and other Halls, and with the Torus on line we will not have as much shaking from it on the Solenoid and the Heat Load from the ESMTL and the DBX will be shared by the Torus, Buffer Dewar and Solenoid.
>
> If needed I will do additional tuning tomorrow so we can power the Solenoid Monday.
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170917/e359ace3/attachment-0002.html>
More information about the Hallb-engineering
mailing list