[Hallb-engineering] [New Logentry] Follow-up Re: Follow-up Re: Solenoid Power-up

kashy at jlab.org kashy at jlab.org
Tue Sep 19 07:20:03 EDT 2017


Logentry Text:
--
Parameter adjustment last night was helpful. More adjustments this morning even better.
For the past hr  max heater power was 8% of 40W and for the past 20 minutes no heaters have been used.
We will ramp the solenoid with this setup and see how it goes.

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3484856
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170919/8b34e5e7/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: attachment.dat
Type: chemical/x-mopac-input
Size: 100 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170919/8b34e5e7/attachment-0002.bin>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc15_20170919_071716.gif
Type: image/gif
Size: 63163 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20170919/8b34e5e7/attachment-0002.gif>


More information about the Hallb-engineering mailing list