[Hallb-engineering] [Revised Logentry] Follow-up Re: Hall B cryo recovery
kashy at jlab.org
kashy at jlab.org
Tue Feb 6 23:20:01 EST 2018
Logentry Text:
--
10:30 All Hall B magnets are full and Cryo is working to switch us to cold return. After we get to cold return and stable we will ramp up the magnets
11:00 We are on cold return and checking cryo stability
11:07 Ramping Torus, interlocks on Solenoid would not clear
11:16 Solenoid interlocks cleared after calling both Probir and Nic and hitting the reset buttons multiple times
11:17 Ramping Solenoid
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3528419
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180206/48a7c339/attachment-0002.html>
More information about the Hallb-engineering
mailing list