[Hallb-engineering] [Revised Logentry] Hall B 4K cryoshutdown
kashy at jlab.org
kashy at jlab.org
Thu May 10 09:50:02 EDT 2018
Logentry Text:
--
Hall B shutdown started at 08:43
Supply flow stopped at 8:52
Cold return shut at 9:23
Warm return valves on the Torus and Solenoid opened on their PID controls
Now slowly T& S opening the warm returns in manual 9:25
Buffer dewar back pressure valve put in manual at 70% open at 9:33
Warm return from Torus and Solenoid (PV8522TCD and SCD) 100% open in manual mode and so is the buffer dewar return valve EV8210BP
Put Cold return valves (in manual mode for Torus and Solenoid PV8522TR and SR) at 100% to keep the TL at the same pressure as the magnets and buffer dewar 9:43
Now waiting for the helium to boil off.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3574333
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180510/5045f835/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20180510_094625.gif
Type: image/gif
Size: 192185 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180510/5045f835/attachment-0003.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20180510_094454.gif
Type: image/gif
Size: 145368 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180510/5045f835/attachment-0004.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20180510_094526.gif
Type: image/gif
Size: 142293 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180510/5045f835/attachment-0005.gif>
More information about the Hallb-engineering
mailing list