Hall B status update
Torus average coil temperature is 65.1K
Solenoid average coil temperurate is 64.7K
Buffer Dewar level is 19.0%

Depending on the status of the cryosystems, Hall B will start flowing helium cooled to 80K some time this week.
Probably after the power outages.




---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3575835
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180521/f900cbbb/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20180521_074129.gif
Type: image/gif
Size: 74637 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180521/f900cbbb/attachment-0001.gif>


More information about the Hallb-engineering mailing list