[Hallb-engineering] [New Logentry] Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Follow-up Re: Hall B 4K cryoshutdown

kashy at jlab.org kashy at jlab.org
Thu May 24 12:00:08 EDT 2018


Logentry Text:
--
Flowing 3g/s through our He/N2 exhangers and sending it to all 3 loads.
System is cooling and looking good.
No contamination was detected.



---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3576159
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180524/8fc744b0/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20180524_115103.gif
Type: image/gif
Size: 64106 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180524/8fc744b0/attachment-0002.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20180524_115253.gif
Type: image/gif
Size: 86379 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20180524/8fc744b0/attachment-0003.gif>


More information about the Hallb-engineering mailing list