RG-B run will end at 8 am tomorrow, Friday, December 20. Thank you everyone for a great support! This was a short, bumpy run but we made a good use of available beam time.
After CEBAF goes down at 8 am, we will survey and bring the hall to Restricted Access. For the sub-system experts, please make sure your subsystem is in a correct state for a long down before eob (Tomorrow is the last work day for JLAB before holidays). Of course, the first thing we need after the beam is off is to turn torus and solenoid OFF. Also please be available at 8am to take care of the sub-system or send me an email if you do not want shifters to turn your subsystem's HVs off.
Some detectors are planing to run cosmic calibration runs during the down time (ECal for example), so we will keep the hall lights of (last person leaving the hall tomorrow evening should make sure lights are off).
If any questions, please send me an email or call the RC phone.
Regards, Stepan
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20191220/cbfd8915/attachment.html>
More information about the Hallb-engineering
mailing list