[Hallb-engineering] Plans for tomorrow, before long holidays

Ruben Fair rfair at jlab.org
Thu Dec 19 21:14:59 EST 2019


Thanks Stepan - I shall be there just before 8am tomorrow

Ruben

________________________________
From: Stepan Stepanyan <stepanya at jlab.org>
Sent: Thursday, December 19, 2019 9:04:53 PM
To: Cole Smith <lcsmith at jlab.org>; Hallb-eng <hallb-engineering at jlab.org>; hallb at jlab.org <hallb at jlab.org>; Bob Miller <rmiller at jlab.org>; Raffaella De Vita <devita at jlab.org>; Rafayel Paremuzyan <rafopar at jlab.org>; Probir Ghoshal <ghoshal at jlab.org>; Ruben Fair <rfair at jlab.org>
Cc: Marco Battaglieri <battagli at jlab.org>; Maurizio Ungaro <ungaro at jlab.org>; silvia at jlab.org <silvia at jlab.org>
Subject: Plans for tomorrow, before long holidays

Dear all,

RG-B run will end at 8 am tomorrow, Friday, December 20. Thank you everyone for a great support! This was a short, bumpy run but we made a good use of available beam time.

After CEBAF goes down at 8 am, we will survey and bring the hall to Restricted Access. For the sub-system experts, please make sure your subsystem is in a correct state for a long down before eob (Tomorrow is the last work day for JLAB before holidays). Of course, the first thing we need after the beam is off is to turn torus and solenoid OFF. Also please be available at 8am to take care of the sub-system or send me an email if you do not want shifters to turn your subsystem's HVs off.

Some detectors are planing to run cosmic calibration runs during the down time (ECal for example), so we will keep the hall lights of (last person leaving the hall tomorrow evening should make sure lights are off).

If any questions, please send me an email or call the RC phone.

Regards, Stepan
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20191220/becc97d0/attachment-0002.html>


More information about the Hallb-engineering mailing list