[Hallb-engineering] No Hall-B Meeting today
Patrick Achenbach
patricka at jlab.org
Mon Jul 21 07:49:11 EDT 2025
Good morning all,
the PAC53 Meeting starts at 9:30 am and I am cancelling today's Hall B Meeting.
Some updates below.
Best regards,
Patrick
News
* Replies for the TAC / PAC reviews have been prepared by the CLAS Collaboration and Hall B.
Current Run (Run Group L)
* Hall B took good production data on deuterium for ALERT with 325 nA beam current; multiple days with > 60% efficiency.
*
Hall B will switch to first pass on July 31st. and go to third pass for ALERT-SRC on Aug. 3rd.
Hall B / Detector / Target Work and Status
* The walkthrough in Hall B did not identify major issues; some areas for cleanup were pointed out that can be taken care of by Hall B technicians and Facility Division.
*
The GEM test area in the EEL building occupied by Hampton University will be cleared to make room for the PRad-II/X17 GEMs; preparations and initial tests will commence soon while full testing of the GEMs can only proceed after receiving electronic boards from SBS in Hall A in August.
* The HyCal cooling system was re-established.
*
Preparations continue for the uRWELL test on the Forward Carriage.
Data Calibration and Processing
* DC: Validation in progress for DC TDC window cuts
*
RG-E: Ready to begin AI network training/validation
*
RG-K: DC calibrations for 2023 in progress
*
RG-L: Working on FTOF run selection
*
New COATJAVA release: https://github.com/JeffersonLab/coatjava/releases/tag/13.0.3
Safety
* No high-hazard work scheduled for this week.
*
Some welding of detector and target mounting parts to be done for PRad-II/X17 setup.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20250721/374824bc/attachment.htm>
More information about the Hallb-engineering
mailing list