Are you back in the hall now continuing with the remainder of the checks?
> On Oct 5, 2016, at 11:59 AM, Pablo Campero <campero at jlab.org> wrote:
>
> Hello Ruben,
>
> This morning we have completed the following tasks:
> 1. Check the system cable interlocks with Morgan.
> 2. CCM load cell control ramp down.
> 3. Vertical support control ram down.
> 4. Vacuum interlock control ramp down.
> 5. Epics watchdog control ramp down- had ALWASY_OFF tag do not seem to be receiving Epics heartbeat, Interlock trips when ALWAYS_OFF was removed.
> 6.Worked on quench detection with Probir.
> - The reset for the interlock needs to be reset from the local mode in the MPS control board, Epics reset button does not work.
> - SOE doesn't work for QD 2 and Q D3 , Probably the Relay wiring needs to be check.
> After this morning we have 16 task completed.
>
> Best Regards,
> Pablo Campero
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-solenoid/attachments/20161005/28312045/attachment.html>
More information about the Hallb-solenoid
mailing list