Guys,
Wouldn't it be easier to use one from Torus in the interim?
Could a strait adapter be used in it's place temporarily and reduce flow upstream of that unit?
Scot Spiegel
Physics / Hall D
JSA Jefferson Lab
12000 Jefferson Ave.
Bldg. 55 Rm. 1546-24
Newport News, VA. 23606
Ph. 757-536-5900
Wk. 757-269-5900
From: "Ruben Fair" <rfair at jlab.org>
To: "Nicholas Sandoval" <sandoval at jlab.org>
Cc: "Scot Spiegel" <spiegel at jlab.org>
Sent: Tuesday, August 22, 2017 7:57:25 AM
Subject: Re: Hall B Solenoid - Replacement flow controller (temporary)
Scot - has the bad controller been shipped out already?
Do we have the spec sheet which details these connections?
we could put in elbows to give us more room if we needed it I guess
Ruben
From: "Nicholas Sandoval" <sandoval at jlab.org>
To: "Ruben Fair" <rfair at jlab.org>
Cc: "Scot Spiegel" <spiegel at jlab.org>, "David Kashy" <kashy at jlab.org>, "Glenn Young" <gyoung at jlab.org>
Sent: Tuesday, August 22, 2017 7:55:19 AM
Subject: Re: Hall B Solenoid - Replacement flow controller (temporary)
Also, we should check if the mechanical connections can swap over before we ship out the bad controller. Or we will need reducers(might not be room to fit), I believe the Hall D inlet/outlet is different.
----- Original Message -----
From: "Ruben Fair" <rfair at jlab.org>
To: "Nicholas Sandoval" <sandoval at jlab.org>
Cc: "Scot Spiegel" <spiegel at jlab.org>, "David Kashy" <kashy at jlab.org>, "Glenn Young" <gyoung at jlab.org>
Sent: Tuesday, August 22, 2017 7:50:13 AM
Subject: Re: Hall B Solenoid - Replacement flow controller (temporary)
Hi Nick,
Yes - please do this as a backup - i.e. have everything ready in case we need it, cable build and so on.
thanks guys
Ruben
From: "Nicholas Sandoval" <sandoval at jlab.org>
To: "Ruben Fair" <rfair at jlab.org>
Cc: "Scot Spiegel" <spiegel at jlab.org>
Sent: Tuesday, August 22, 2017 7:44:28 AM
Subject: Re: Hall B Solenoid - Replacement flow controller (temporary)
Hi Ruben,
I already spoke with Tim and he said we could borrow a hall D spare.
Unfortunately the Hall D flow controllers are +/-15VDC supply and use an external controller. To make it work for us we would need to run a new control cable, install a bipolar supply, and probably install one or two of our spare analog cards to put in analog voltage mode.
I will draw up a quick schematic and talk with Scot about it. We can keep in our back pocket just in case.
Best Regards,
Nick
----- Original Message -----
From: "Ruben Fair" <rfair at jlab.org>
To: "Scot Spiegel" <spiegel at jlab.org>, "Nicholas Sandoval" <sandoval at jlab.org>
Sent: Tuesday, August 22, 2017 7:06:02 AM
Subject: Hall B Solenoid - Replacement flow controller (temporary)
Gentlemen,
If the repair takes too long and/or the new units take too long to get here, is there another flow controller on site that we could borrow as a temporary measure that would suit our needs?
Regards
Ruben
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-solenoid/attachments/20170822/247add7f/attachment.html>
More information about the Hallb-solenoid
mailing list