Hi,

We have cleaned up whatever was left unorganized since the survey of the
e-detector. Our tool box is now kept in the tunnel next to the 4th dipole.
The e-detector survey-stand is put back in the EEL on the top shelf.

RADCON has been informed that we don't need the radioactive source in the
EEL anymore for next sometime. We can let him decide if they want to leave
it in EEL until we are ready to bring it in the tunnel, or if they want to
take it back.

We can try to start putting together the QWADs in the tunnel sometime this
week. Seems like we have everything that we need, we will see when we start.


cheers
--
Amrendra Narayan
757-952-6126