[Hallc_running] [New Logentry] RC daily update
berdnik at jlab.org
berdnik at jlab.org
Fri Apr 27 09:55:01 EDT 2018
Logentry Text:
--
-- Smooth data taking during swing and owl shift.
-- No unplanned downtime events
-- Kinematic group 6 is completed
-- Kinematic group 5 almost done
-- MCC will take beam away from us starting 12-00 to 14-00 for Injector testing ;
they trying to understand increased trip rate during high current operation, when HallC required (50-60)uA;
result can limited HallC current to 40uA during weekend;
-- HCANA have a memory leak https://logbooks.jlab.org/entry/3567760
-- Run_4046 and Run_4043 can not be replayed because hit memory limit https://logbooks.jlab.org/entry/3568063
-- Steve and Eric investigating; Run_4043 replayed after increasing limit from 8 to 10 Gb
Hall C Daily RC meeting: We will meet today at 1:30 p.m. in the conference room located on the second floor of the counting house.
Remote participation will be possible via Blue Jeans (Meeting ID: 543903672). You can join via:
browser: https://bluejeans.com/543903672
phone: (888) 240-2560 (US toll free), list of international numbers: https://bluejeans.com/numbers
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3568092
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20180427/aa5a69a5/attachment.html>
More information about the Hallc_running
mailing list