[Hallc_running] [New Logentry] RC Daily Update
berdnik at jlab.org
berdnik at jlab.org
Thu Mar 15 15:15:02 EDT 2018
Logentry Text:
--
Dear collaborators,
The news given at accelerator meetings are quite good and opportunistic. The new transformer is installed and warming up. Actual load test will start tonight. The necessary twin of the new transformer will be set-up this week and tested during the week end. If no showstopper appear, accelerator operation is scheduled to restart around the coming Monday (March 21st), with beam to all halls by about the 23rd.
All shifts till March 21 Day shift is cancelled.
Starting Day shift March 21 till March 26 Owl included, we will need only two person in counting house: Shift Leader and Target operator. We will probably have some beam which we can use for physics. According to shift schedule we have bunch of 3rd person during this time but not SL, so, please,resign to SL if you feel comfortable.
Starting March 26 Day shift all will back to normal with 3 person in counting house.
We are calling for collaborators of good will to take the shifts. So please sign up!
Hall C Daily RC meeting: We will meet tomorrow (Friday March 16) at 1:30 p.m. in the conference room located on the second floor of the counting house. Remote participation will be possible via Blue Jeans (Meeting ID: 543903672). You can join via:
browser:
https://bluejeans.com/543903672
phone:
(888) 240-2560 (US toll free)
list of international numbers: https://bluejeans.com/numbers
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3544779
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20180315/3bffd8b0/attachment.html>
More information about the Hallc_running
mailing list