[Hallc_running] [New Logentry] RC Update
bduran at jlab.org
bduran at jlab.org
Tue Oct 4 10:55:01 EDT 2022
Logentry Text:
--
Starting early Monday morning to midnight, the accelerator was down due to another magnet (MZA8S03) over temp.
We took a controlled access for Joe, Steve L., and Ellen to look into the SHMS Q2 magnet (which didn't fully ramp up to the MOL at 3465 A) and HMS rotation issues (throws a drive controller error around 21 degrees). See HCLOG entries by Ellen and Steve on the SHMS Q2 and HMS rotation https://logbooks.jlab.org/entry/4050566, https://logbooks.jlab.org/entry/4050570. The SHMS Q2 ramps up to the MOL at high momentum setting right now but Ellen noted that a new supply will be used for the replacement later when we get an opportunistic access.
When the beam was restored to the hall C last night, we resumed single arm data taking for the calibration and PID threshold checks which was completed early morning today. When the SHMS was rotated to the 8 degrees this morning for the SHMS hodoscope paddle test this morning, it went below 8 deg (7.98 deg) and hit the limit switch. This angle is good enough for us to perform the hodoscope paddle test so we proceeded with taking data. I talked to Joe Beaufait needs an access to the hall. We're planning to do it in an hour.
We will have an RC meeting at 11 am today. Here is the link:
https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4050992
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20221004/e5f20f1c/attachment.html>
More information about the Hallc_running
mailing list