Yesterday at 9:15 am, the pass change started. Around 6 pm, we had the beam back into the hall.
Finished tasks:
* Steven reset the GUI to match the angles in the camera.
*Hanjie and Rob fixed the MSS copying script issues: https://logbooks.jlab.org/entry/4305261
Data taken:
KinC_x50_2 is completed.
KinC_x60_3 is completed.
KinC_x50_3 is in the final stage (completing the runs for our last target - LH2).
Outstanding issues:
*We could not take the data for KinC_x36_3 because the HMS had to go to 12.373 degrees, which was lower than the allowed limit by the proximity switch. To reach that angle, we need to request an escorted access into the hall with Steven and a few techs. This will take about 30 minutes and, if done, it will be after 2 pm. Spokespeople are evaluating this possibility and may need further discussion in the 11 am meeting.
* Currently, we are planning to go to the KinC_60_4 with NPS at 14.075 degrees. The smallest angles of the NPS (KinC_x25_4 and KinC_x36_6) are to be evaluated based on the anode current we observe.
* We need to discuss the plan for Sunday. The beam will be taken for studies from 7 to 7:30 am, potentially sending up to 60 µA to the hall. The target needs to be maintained, so TO will be required. There is the possibility of taking BCM calibrations (to be discussed).
Link to the 11:00 RC meeting:
https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
Meeting ID: 161 701 5555
Passcode: 288953
Nathaly Santiesteban
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4305993
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20240516/25ac5d43/attachment.html>
More information about the Hallc_running
mailing list