This morning Facilities gave an update at the MCC meeting. The installation and the testing of the trip unit (between transformer upstairs and switchboard) has been completed yesterday as well as the testing of all the breakers at the switchboard. The scaffolding has been removed this morning. Facilities is on track for "warming up" the transformer and the switchboard starting with this afternoon. There will be no power to the Hall equipment downstream of the switchboard. The step-by-step loading of the 96-SWBD-ESC switchboard with Hall equipment will start tomorrow morning. Please check these links for a detailed plan of the process:
https://tasklists.jlab.org/hclist/tasks/116304
https://logbooks.jlab.org/entry/4370322
We will have a RC meeting today on the second floor of the counting house and on zoom at: https://logbooks.jlab.org/entry/4346862
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4370837
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallc_running/attachments/20250507/f8b3022b/attachment.htm>
More information about the Hallc_running
mailing list