[Halld-cal] [EXTERNAL] BCAL calibration status

Elton Smith elton at jlab.org
Wed Apr 1 07:34:53 EDT 2020


Hi Zisis and Karthik,

Thanks for the effort to complete the gain calibrations and keeping us 
up-to-date. I am replying to the halld-cal list, which is where future 
communications should be sent so that everyone is informed and also we 
keep a record of the communications.

Cheers, Elton

Elton Smith
Jefferson Lab MS 12H3
12000 Jefferson Ave STE 4
Newport News, VA 23606
(757)269-7625
(757)269-6331 fax

On 3/31/20 8:27 PM, Zisis Papandreou wrote:
> Hi Sean:
>
> as you saw from Karthik’s email, he started with the fall 2018 gains, 
> then applied Mark’s ratio, and started iterations.  He is looking at 
> Batch 1, runs 71350-71591. (As this batch was for 150/250 nA, we will 
> look at the other batches at 350 nA later, to see if any tweaks in the 
> gains will be needed.)
>
> 6 iterations have completed.  The file is attached below (to make it 
> smaller, Karthik removed the 2D plots of 2g vs channel no; those are 
> available upon request.)
>
> It looks like it takes ~3 hrs to do an iteration, so by tomorrow we 
> should have 2-3 more iterations, and then see if the top left plot (2g 
> vs channel no fits) converges to a line, for all three layers.
>
> Cheers, Zisis...
>
>
>> On Mar 31, 2020, at 3:00 PM, Sean Dobbs <sdobbs at fsu.edu 
>> <mailto:sdobbs at fsu.edu>> wrote:
>>
>> Great news, thanks!
>> I suppose this is starting with flat gains?
>>
>> Cheers,
>> Sean
>>
>>
>> On Tue, Mar 31, 2020 at 4:58 PM Zisis Papandreou <zisis at uregina.ca 
>> <mailto:zisis at uregina.ca>> wrote:
>>
>>     Hi Sean:
>>
>>     Karthik reports: /The calibration for spring 2020 (batch 1) is
>>     going smooth and I have completed 4 iterations for now and 5th
>>     iteration is running in the farm. I am attaching the plots that
>>     we usually produce when we do the calibration./
>>
>>     The file was very large and Karthik will modify it to make it
>>     easier to work with. Just to show you that things are appearing
>>     to converge, I am attaching a couple of screen shots.
>>
>>     Karthik is now estimating how lone it will take to finish the 5th
>>     iteration, and we will see whether we need to go to 8, or whether
>>     we can live with fewer.
>>
>>     We will continue to keep you posted.
>>
>>     Cheers, Zisis...
>>
>>     <mean and sigma.png>
>>
>>     <gain constants.png>
>>
>>>     On Mar 30, 2020, at 10:55 AM, Sean Dobbs <sdobbs at fsu.edu
>>>     <mailto:sdobbs at fsu.edu>> wrote:
>>>
>>>     Hi Zisis,
>>>
>>>     Thanks very much for the update.  I prefer to have the BCAL gains at
>>>     an advanced stage, if not complete, before we do the next monitoring
>>>     launch.  So let's plan to keep this a high priority and hope to
>>>     launch
>>>     on Friday or Monday if need be.
>>>
>>>     Cheers,
>>>     Sean
>>>
>>>     On Mon, Mar 30, 2020 at 12:50 PM Zisis Papandreou
>>>     <zisis at uregina.ca <mailto:zisis at uregina.ca>> wrote:
>>>>
>>>>     Hi Sean:
>>>>
>>>>     we had a another Regina group meeting this morning, where
>>>>     Karthik reported the activities.  Tegan also joins these.
>>>>
>>>>     1) PrimEx jobs: jobs are finally running on the farm.  Igal
>>>>     gave Karthik some advise on how to tune job requirements so
>>>>     that the jobs can run faster on the farm.
>>>>
>>>>     2) GlueX jobs:
>>>>     - Two test jobs completed without any issues.  The mass is
>>>>     coming out from the fits at 135 MeV/c2.  There are not enough
>>>>     statistics to see things cell by cell or to compare the layers,
>>>>     but it looks good so far.
>>>>     - The fall 2019 pi0 calibration took 6 iterations to converge,
>>>>     which were completed in less than a week while the farm was not
>>>>     too busy.  Tegan noted that whether one starts from flat gains
>>>>     or previous ccdb gains, the convergence of the iterations takes
>>>>     about the same amount of time.
>>>>
>>>>     Question: Sean et al: it is not likely that the GlueX
>>>>     jobs/iterations will complete by April 1.  We hope that more
>>>>     jobs will complete by tomorrow, perhaps offering us enough
>>>>     stats to see the layers fits and cells.  If this happens *and*
>>>>     the results look good, we could discuss whether to postpone the
>>>>     launch towards the end of the week, when we hope the
>>>>     calibration should be close to complete. Thoughts?
>>>>
>>>>     Cheers, Zisis...
>>>>
>>>>     On Mar 27, 2020, at 1:29 PM, Sean Dobbs <sdobbs at fsu.edu
>>>>     <mailto:sdobbs at fsu.edu>> wrote:
>>>>
>>>>     Hi Zisis and Karthik,
>>>>
>>>>     Thanks a lot for the report.  We will keep an eye on how things
>>>>     progress and modify the schedule accordingly.  My jobs have been
>>>>     sitting there forever as well.
>>>>
>>>>     Maybe we should discuss bumping up Karthik's priority on the farm,
>>>>     since this is urgent?
>>>>     An additional idea is that after this iteration, we can pull
>>>>     the files
>>>>     from tape, pin them to the cache disk, and then he can be sure that
>>>>     they are all on disk for future iterations.
>>>>
>>>>     Cheers,
>>>>     Sean
>>>>
>>>>     On Fri, Mar 27, 2020 at 2:32 PM Zisis Papandreou
>>>>     <zisis at uregina.ca <mailto:zisis at uregina.ca>> wrote:
>>>>
>>>>
>>>>     Hi everyone:
>>>>
>>>>     we had a group meeting this morning in Regina to discuss the
>>>>     PrimEx and GlueX BCAL calibrations.
>>>>
>>>>     PrimEx: Karthik did a quick test with runs from He with CDC on
>>>>     and sees good pi0 peaks in the Layer 1 and 2 cells, but not in
>>>>     3 and barely anything in 4 (the last one is not expected, due
>>>>     to low penetration of showers there). The calibration from past
>>>>     GlueX runs does not show this L3 behaviour. We are still
>>>>     investigating, including checking how well the skims work, when
>>>>     there is no B-field on.  Also, Karthik will look at hdview to
>>>>     see if anything interesting is observable.  Assuming we fix L3,
>>>>     then calibration can proceed, where we will have to bump up the
>>>>     pi0 mass from 130 to 135.  This will be a PrimEx-specific set
>>>>     of gains, entered in a suitable place in ccdb.
>>>>
>>>>     GlueX: Sean, see Karthik’s email below.  H checked and his
>>>>     account is ok, no holds on it, proper use of sqlite, etc, after
>>>>     getting advice from Mark Ito on how to do all that. As the jobs
>>>>     are at a virtual standstill, it does not look like we can make
>>>>     the April 1 launch.  Of course, we can wait over the weekend
>>>>     and see if by Monday some of the jobs get executed, and then
>>>>     decide what to do then (go ahead, or delay the launch).
>>>>
>>>>     Comments, thoughts?
>>>>
>>>>     Cheers, Zisis…
>>>>
>>>>     =============
>>>>
>>>>
>>>>     Good morning,
>>>>
>>>>     I applied the gainratios to the existing ccdb gains and submitted a
>>>>     small test batch on the 25th of march (wednesday). The jobs has
>>>>     been in
>>>>     the depend state since then. I understand that this is because
>>>>     of a lot
>>>>     of jobs being submitted to the farm lately. However, if this
>>>>     continues,
>>>>     I am not sure if we can deliver the gains by April 1. I shall
>>>>     continue
>>>>     to do the gains and deliver it at the latest. This is in the
>>>>     top of my
>>>>     priority list.
>>>>
>>>>     Thank you
>>>>
>>>>     Karthik Suresh
>>>>
>>>>     On Mar 25, 2020, at 12:20 PM, Igal Jaegle <ijaegle at jlab.org
>>>>     <mailto:ijaegle at jlab.org>> wrote:
>>>>
>>>>     Thank you Zizis & Karthik, your help is much appreciated.
>>>>
>>>>     tks ig.
>>>>     ________________________________
>>>>     From: Zisis Papandreou <Zisis.Papandreou at uregina.ca
>>>>     <mailto:Zisis.Papandreou at uregina.ca>>
>>>>     Sent: Wednesday, March 25, 2020 1:29 PM
>>>>     To: sdobbs at fsu.edu <mailto:sdobbs at fsu.edu> <sdobbs at fsu.edu
>>>>     <mailto:sdobbs at fsu.edu>>; Mark-Macrae Dalton <dalton at jlab.org
>>>>     <mailto:dalton at jlab.org>>; Elton Smith <elton at jlab.org
>>>>     <mailto:elton at jlab.org>>; gasparan at jlab.org
>>>>     <mailto:gasparan at jlab.org> <gasparan at jlab.org
>>>>     <mailto:gasparan at jlab.org>>; Igal Jaegle <ijaegle at jlab.org
>>>>     <mailto:ijaegle at jlab.org>>; Ilya Larin <ilarin at jlab.org
>>>>     <mailto:ilarin at jlab.org>>; Jonathan Zarling <jzarling at jlab.org
>>>>     <mailto:jzarling at jlab.org>>; lgan at jlab.org
>>>>     <mailto:lgan at jlab.org> <lgan at jlab.org <mailto:lgan at jlab.org>>;
>>>>     Alexander Somov <somov at jlab.org <mailto:somov at jlab.org>>;
>>>>     ksv656 at uregina.ca <mailto:ksv656 at uregina.ca><ksv656 at uregina.ca
>>>>     <mailto:ksv656 at uregina.ca>>
>>>>     Subject: Re: [EXTERNAL] Re: BCAL calibration status
>>>>
>>>>     Hi Sasha and Igal:
>>>>
>>>>     thanks for summarizing the PrimEx goals.  This is helpful.
>>>>
>>>>     Sorry that these calibrations had not bee done earlier, but
>>>>     much like City Officials, we are "complaint" driven. I wish we
>>>>     were more proactive.
>>>>
>>>>     Anyhow, rest assured that this has a high priority now. 
>>>>     Karthik is juggling PrimEx and the GlueX calibration (to meet
>>>>     the launch date).   On the former, he may have some plots later
>>>>     in the day, and if these look ok, he can turn the crank and do
>>>>     all the runs.
>>>>
>>>>     We will keep you posted.
>>>>
>>>>     Cheers, Zisis...
>>>>
>>>>
>>>>
>>>>     Dr. Zisis Papandreou
>>>>     Head, Department of Physics
>>>>     Professor of Physics, Ph.D, P.Phys.
>>>>     ---------------------------------------------------------
>>>>     Department of Physics
>>>>     University of Regina
>>>>     3737 Wascana Parkway
>>>>     Regina, SK  S4S 0A2     CANADA
>>>>
>>>>     Phone: (306) 585-5379
>>>>     Fax: (306) 585-5659
>>>>     Email: zisis at uregina.ca <mailto:zisis at uregina.ca>
>>>>     Website:
>>>>     https://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou/
>>>>     <https://urldefense.com/v3/__https://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou/__;%21%21PhOWcWs%21lYKDfQmd6uehc2l57agVvudr58rCki-gmq37OV_v-mjsS3gAi8qT_jR1mLeUAA$>
>>>>
>>>>     Alexander Somov <somov at jlab.org <mailto:somov at jlab.org>>
>>>>     03/17/20 8:05 PM >>>
>>>>
>>>>     Hi Zisis, All,
>>>>
>>>>     I apologize for the late response, too many things
>>>>     today.
>>>>
>>>>     As we have discussed, the BCAL calibration precision
>>>>     for PrimEx runs should be the same as for other GlueX
>>>>     runs. At least there should be no shifts in mass
>>>>     distributions of pi0, etc. We don't request anything
>>>>     special.
>>>>
>>>>     BCAL will be used to subtract background from
>>>>     hadronic interactions.
>>>>
>>>>     BCAL is a part of the PrimEx equipment, and PrimEx
>>>>     is the GlueX experiment, so we expect to
>>>>     receive support from the collaboration
>>>>     (BCAL group).
>>>>
>>>>     Timeline. I Was pretty much sure that the calibration
>>>>     has already been done. Elton reported this
>>>>     when I asked about the BCAL calibration status for
>>>>     PrimEx runs during the GlueX meeting.
>>>>     Obviously it was a wrong statement (based on Igal's
>>>>     checks).
>>>>
>>>>     ----
>>>>
>>>>     I don't know how much work is needed to do calibration. Perhaps
>>>>     applying some simple
>>>>     corrections would be enough.
>>>>
>>>>     Cheers,
>>>>                Sasha
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>     ________________________________
>>>>     From: Zisis Papandreou <Zisis.Papandreou at uregina.ca
>>>>     <mailto:Zisis.Papandreou at uregina.ca>>
>>>>     Sent: Tuesday, March 17, 2020 9:25 AM
>>>>     To: sdobbs at fsu.edu <mailto:sdobbs at fsu.edu> <sdobbs at fsu.edu
>>>>     <mailto:sdobbs at fsu.edu>>; Mark-Macrae Dalton <dalton at jlab.org
>>>>     <mailto:dalton at jlab.org>>; Elton Smith <elton at jlab.org
>>>>     <mailto:elton at jlab.org>>; Igal Jaegle <ijaegle at jlab.org
>>>>     <mailto:ijaegle at jlab.org>>; Jonathan Zarling <jzarling at jlab.org
>>>>     <mailto:jzarling at jlab.org>>; Alexander Somov <somov at jlab.org
>>>>     <mailto:somov at jlab.org>>; ksv656 at uregina.ca
>>>>     <mailto:ksv656 at uregina.ca><ksv656 at uregina.ca
>>>>     <mailto:ksv656 at uregina.ca>>
>>>>     Subject: [EXTERNAL] Re: BCAL calibration status
>>>>
>>>>     Hello Igal et al:
>>>>
>>>>     yes, work is being done: jobs are running on the calibration
>>>>     and MC studies are also being carried out. While we wait for
>>>>     those, this is a good time to get "organized".
>>>>
>>>>     In our group, we are not sure of what the objectives and
>>>>     priorities are for the Primex runs, particularly as they
>>>>     pertain to the BCAL
>>>>
>>>>     Igal, can you or Sasha, perhaps make a few slides or write a
>>>>     one-pager, explaining those objectives?  It would be good if
>>>>     there were timelines (of what you are trying to extract from
>>>>     the data) or the tasks listed in order of priority.  We could
>>>>     then go over those at this Thursday's Calorimetry meeting.
>>>>
>>>>     The reason we ask for this is that the Regina crew has other
>>>>     tasks on their plates and we should optimize our collective
>>>>     operations.  In parallel, Karthik and Varun are studying to
>>>>     take their Ph.D. Comprehensive exams in May.
>>>>
>>>>     Thanks and best regards, Zisis...
>>>>
>>>>
>>>>
>>>>     Dr. Zisis Papandreou
>>>>     Head, Department of Physics
>>>>     Professor of Physics, Ph.D, P.Phys.
>>>>     ---------------------------------------------------------
>>>>     Department of Physics
>>>>     University of Regina
>>>>     3737 Wascana Parkway
>>>>     Regina, SK  S4S 0A2     CANADA
>>>>
>>>>     Phone: (306) 585-5379
>>>>     Fax: (306) 585-5659
>>>>     Email: zisis at uregina.ca <mailto:zisis at uregina.ca>
>>>>     Website:
>>>>     https://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou/
>>>>     <https://urldefense.com/v3/__https://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou/__;%21%21PhOWcWs%21lYKDfQmd6uehc2l57agVvudr58rCki-gmq37OV_v-mjsS3gAi8qT_jR1mLeUAA$>
>>>>
>>>>     Igal Jaegle <ijaegle at jlab.org <mailto:ijaegle at jlab.org>>
>>>>     03/17/20 3:59 AM >>>
>>>>
>>>>     BCAL colleagues,
>>>>
>>>>     Do you have any news for the BCAL calibration of the PrimEX-D
>>>>     measurements?
>>>>
>>>>     tks ig.
>>>>
>>>>
>>>>
>>>>     Dr. Zisis Papandreou
>>>>     Head, Department of Physics
>>>>     Professor of Physics, Ph.D., P.Phys.
>>>>     ---------------------------------------------------------
>>>>     Department of Physics
>>>>     University of Regina
>>>>     3737 Wascana Parkway
>>>>     Regina, SK  S4S 0A2  CANADA
>>>>
>>>>     Phone: (306) 585-5379
>>>>     Fax: (306) 585-5659
>>>>     Email: zisis at uregina.ca <mailto:zisis at uregina.ca>
>>>>     Website:
>>>>     http://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou/index.html
>>>>     <https://urldefense.com/v3/__http://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou/index.html__;%21%21PhOWcWs%21lYKDfQmd6uehc2l57agVvudr58rCki-gmq37OV_v-mjsS3gAi8qT_jQSb9zAng$>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>     Dr. Zisis Papandreou
>>>>     Head, Department of Physics
>>>>     Professor of Physics, Ph.D., P.Phys.
>>>>     ---------------------------------------------------------
>>>>     Department of Physics
>>>>     University of Regina
>>>>     3737 Wascana Parkway
>>>>     Regina, SK  S4S 0A2  CANADA
>>>>
>>>>     Phone: (306) 585-5379
>>>>     Fax: (306) 585-5659
>>>>     Email: zisis at uregina.ca <mailto:zisis at uregina.ca>
>>>>     Website:
>>>>     http://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou/index.html
>>>>     <https://urldefense.com/v3/__http://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou/index.html__;%21%21PhOWcWs%21lYKDfQmd6uehc2l57agVvudr58rCki-gmq37OV_v-mjsS3gAi8qT_jQSb9zAng$>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>
>
>
>
>
> Dr. Zisis Papandreou
> Head, Department of Physics
> Professor of Physics, Ph.D., P.Phys.
> ---------------------------------------------------------
> Department of Physics
> University of Regina
> 3737 Wascana Parkway
> Regina, SK S4S 0A2 CANADA
>
> *Phone: (306) 585-5379*
> Fax: (306) 585-5659
> Email: zisis at uregina.ca <mailto:zisis at uregina.ca>
> Website: 
> http://www.uregina.ca/science/physics/people/faculty-research/zisis-papandreou/index.html 
> <https://urldefense.proofpoint.com/v2/url?u=http-3A__www.uregina.ca_science_physics_people_faculty-2Dresearch_zisis-2Dpapandreou_index.html&d=DwMFaQ&c=CJqEzB1piLOyyvZjb8YUQw&r=c-_tH8evYLC4MjBfbp0hiQ&m=L9K-OoIwqk5DKjlr1cfFyqg-V-On_gBLT7g_-xpoYVw&s=YY00N7HeNHCOuCtrD_QDLjdQMkkLKhs2Wd-UwIQijKk&e=>
>
>
>
>
>
>
>



More information about the Halld-cal mailing list