Minutes
Present: Dave, Mark, Scot, Hovanes
[edit
<https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_8-Jan-2015&action=edit§ion=3>]
Announcements
* Yi will be leaving at the end of January. Hall D group needs to
learn the slow controls subsystem that Yi has developed. Dave and
Brian are looking into the PXI system for the solenoid.
[edit
<https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_8-Jan-2015&action=edit§ion=4>]
Gas system
* Dave will be working on the gas system controls. Namely he will
implement the communications between PLC and the Brooks controllers
to be able to set the most parameters in the controller downstairs
from PLC. We would like to be able to change the flow or to
completely shut off the valves in the MFC in the hall from the hall.
* Dave also suggested to have a NC solenoid valve for each FDC package
so that we do not need to rely on the serial communications in case
of emergency. It was pointed out that this is something that may
trigger a review, the FDC group needs to make decisions on that.
[edit
<https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_8-Jan-2015&action=edit§ion=5>]
Remote reset of CAENs
* Dave have plans for redoing the remote reset for CAENs without using
5V output modules that currently kill the HV from CAEN each time PLC
is rebooted.
* This may require additional purchases of PLC equipment, Hovanes will
ask Eugene about POA.
[edit
<https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_8-Jan-2015&action=edit§ion=6>]
Warm magnet power supplies
* The procedures for TAG5C and SWEEP magnet ramping require approching
the desired setpoint from above after staying near the saturation
point for a while.
* During the fall run we had incidents for both PS and tagger where
the magnet currents were not raised to the *maximum* values before
putting them at the nominal setpoint.
* Accelerator magnets approach their desired setpoints from below
after looping multiple times for degaussing, so the existing
software does not accommodate TAG5C and SWEEP, but probably can be
modified to execute our simple loop.
* Hovanes will talk to Gary about making such changes.
[edit
<https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_8-Jan-2015&action=edit§ion=7>]
Solenoid controls work
* Mark would like to have the correct time maintained on the solenoid
power supply. He thinks the precision might be limited to 1sec by
the power supply, but he will be check that.
* Dave is planning to implement some mechanism by which the time will
be transferred from PLC to the power supply either periodically or
upon some condition being satisfied. He would like to have a PLC tag
connected to EPICS that reports a correct time.
* Hovanes suggested to use the time from EPICS/PLC interface IOC for
the solenoid. He will send Dave the name of the tag, and Dave will
take care of the conversion. Hovanes will also see if the server on
which the production version of that IOC is running can be synced
with JLab time servers.
* Flow meters for the leads will be replaced by Scot.
* Dave is considering a possibility of being able to stop a slow dump
and ramping PS back to the setpoint. This might not be so easy, if
not impossible, to do without going to the fast dump, according to
Mark.
* New liquid level sensor will be installed and needs to be integrated
with the controls system.
* Monitoring circuit for GFD is being worked on by Mark.
[edit
<https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_8-Jan-2015&action=edit§ion=8>]
More alarms
* Mark will send Hovanes a list of LCW quantities which will be useful
to have in the magnet section of the Hall D alarm system.
* Scot suggested to have the hall humidities and temperatures in the
alarm system as well. Hovanes will add them.
[edit
<https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_8-Jan-2015&action=edit§ion=9>]
Other items
* Two more motors will probably be installed for April running: beam
profiler in front of the collimator and the polarimeter target in
front of the east wall of the collimator cave.
* The specs for the polarimeter target motion system is still not well
known, the details are coming in.
* The stage for the beam profiler is being designed, the cabling is
expected to be very similar to collimator and harps.
* Target controls by the JLAB target group is pretty much done. They
implemented the target controls in compact-RIO, but have an EPICS
CA-server (or IOC) to interface it with Hall D EPICS. The target
group needs a Windows PC in the counting house. we can share the
halldsc7 that Dave is using for PLC with them. Hovanes will setup a
meeting with the target group to work out the details of integration.
* Scot reminded us that TAC motor needs to be tested. It has been
locked-out/tagged-out during the last fall running. Hovanes will get
together and check that the TAC stage is fine.
On 01/07/2015 09:48 AM, Hovanes Egiyan wrote:
> Happy New Year,
>
> We should restart having our regular Hall D controls meetings this week.
> We will have our Hall D slow controls meeting on January 8, 2015,
> at 9:30am in A110. I posted the preliminary agenda on the wiki page:
>
> https://halldweb1.jlab.org/wiki/index.php/Controls_Meeting_8-Jan-2015
>
> The main topics of the meeting will be short updates on what each of
> us is working or will be working for the April engineering run.
> Please, feel free to add your topics for discussion to the agenda.
>
> Hovanes.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/halld-controls/attachments/20150108/e43c8cdf/attachment.html
More information about the Halld-controls
mailing list