Private:Hall D Staff Meeting, July 19, 2010
Present: George Biallas, Eugene Chudakov (chair), Mark Ito, Lubomir
Pentchev, Yi Qiang, Sascha Somov, Simon Taylor, Tim Whitlatch, Elliott
Wolin, Glenn Young, Beni Zihlmann
Eugene
* BIASOL fixed for this fiscal year, 420 k$ in total
+ taken from BIAGRP, BIAOLC during last go-around
+ this round: taken from BIAOLC, electronics, other bia projects
* most likely that FY11 will be under a continuing resolution for 6
months
* 12 GeV project is immune
+ DOPS and BIA subject to restrictions: FY10 budget - 10%
* Lab thinking about a general strategy for budget for 12 GeV
operations
+ various scenarios for operations
+ Larry: increase by 1/3 (one hall)
+ what if flat?
o run three halls, fourth hall fallow or mothballed
o physics staff dedicated to a hall
o tech and support staff held at current level and shared
among three running halls
o less efficient, even for three halls running at once
o perhaps fewer weeks of running
* BIACAL finished this year
Mark
* computing model, spreadsheet using CLAS model
* iteration on calibration database with David
* some activity on UMass and FSU MOU's with Elton
* round claiming of progress for BIAOLC
Yi
* SiPM lifetime due to radiation damage
+ Pavel Degtiarenko: with 1/3 efficiency, 7 to 10 years for a
factor of 10 in noise
+ Pavel's simulation of Hall A: factor 2.5 higher than dose
measured
+ looking at damage with a calibrated source
o 32 rem, increase of 3.5 with source
o compare with 35 rem in Hall A giving a factor of 10 in
damage
+ 1x1 SiPM has an anomaly: much higher damage than 3x3
* continuing on HMI work for solenoid test
David
* field uniformity studies with Simon, document about to be uploaded
to DocDB
+ not a lot of gain so far
+ perhaps even gains for non-uniform field
+ field configurations so far limited to those with the current
yoke
* calibration condition database specification
+ try to have it done before Dmitry gets here
* 48-core machine not available last week
+ funny behavior: sometimes slow, sometimes fast
* workshop on parallelization: first draft of all documents done
* working with students: ROOTSpy, event viewer, Micah's thesis
project
* looking at understanding implications of multiple events in one
trigger
Simon
* fast helical fitter using drift time information constructed
+ constant field, different field configurations tried
+ runs 4 times faster, systematic errors due to non-constant
field
* working on Kalman fitter, SIMD issue
+ certain versions of gcc, OS's: does not work
+ for now disabled
Lubomir
* working with Fastrack estimating when parts are needed
+ assume new clean room in October
+ need about 2.5 weeks to make one layer prototype
+ assumes 8 people full time
+ start mass production in November
* procurements proceeding
* wire winding progress: UVa has position measurements working, work
on tension measurements
* response from IUCF on strong-backs
+ they are ready to ship
+ here in several weeks
* will attend conference: applications of accelerators in research
and industry
Elliott
* dana-evio work with new jana
+ application to event display
+ will add objects to event display
* magnet test:
+ today is moving day, racks to test lab
o locations have been identified
o racks mostly done, a few parts coming in
+ power supply, new flow switches, dump resister replaced for
one coil
+ OSP: try for final documents end of month
+ PLC programming almost done
+ arranging connection to guard shack, from test set-up
+ polarity needs to be chosen
George
* Elton and Eugene working on response to turn-to-turn concern of
reviewer
* path for designing a new magnet:
+ going to DOE on the 26th with a proposal
+ Claus, Allison
* coil 1 complete and ready for test
* IUCO reports leak-tight shield[?] on coil 3
* coil 2 waiting for tooling for support of coils
Tim
* ES&H item: putting rack together in F117, requirement that things
are not plugged in violated a few weeks ago
+ will use administrative lock from now on
* design review on tagger magnet: sascha put together requirements
+ 1010 vs. 1006[?] steel, vacuum annealing need
* CDC parts to be modified to adjust tolerances
* still waiting on straws for cdc
Beni
* continuing work on CDC, 6 to 8 week delay with modification of
donuts and feedthroughs
+ will also delay review
* FDC cosmic test stand data
+ see same effects as Lumomir with his flash, see similar
evidence for oxygen contamination
+ moving to bottom layer, 3rd, of prototype: do a test run to
check it out.
+ looks like wire resolution is within specs, about 200 microns
+ strip resolution getting: 600 microns, without gain
calibration
* discussion at pid meeting about doing walk corrections on tof with
data: started to look at this
Sascha
* prepared stuff for trigger workshop
* prepared sguff for tagger mini-review
* working on simulation of level 1 trigger with low-level digital
data
* diamond sent to UConn is still alive
+ one guy working on mounting; using carbon fiber
+ diamond dimentions: 4.5 x 4.5 mm x 10 microns
+ CHESS run not yet planned