[Halld-jlab] Hall D Staff Meeting Notes, Sep. 27
Mark M. Ito
marki at jlab.org
Mon Sep 27 16:58:55 EDT 2010
Find the notes at
http://www.jlab.org/Hall-D/software/wiki/index.php/Private:Hall_D_Staff_Meeting%2C_September_27%2C_2010
and below as text.
Private:Hall D Staff Meeting, September 27, 2010
Present: Fernando Barbosa, Eugene Chudakov (chair), Hovanes Egiyan,
Senika Grayer, Mark Ito, Lubomir Pentchev, Yi Qiang, Dmitry
Romanov, Elton Smith, Sasha Somov, Chris Stanislav, Simon Taylor,
Tim Whitlatch, Elliott Wolin
We limited reports only to those relevant for this week's Lehman
Review.
Eugene
* We have some money left over at the end of this fiscal year in
DOPS.
* Lehman review tomorrow
* Writing paper with Elton to describe dangers due to shorts in the
LASS solenoid.
Tim
* more straws received at CMU, inspected, go ahead given to finish
order
+ 1/2 in hand now, 1/2 to come
* FDC clean room contract awarded
+ meeting this week to hammer out details, schedule
+ 290 k$
* plastic pieces being prepared at vendor
* tagger magnet: waiting for final drawings to be checked and signed
+ order will be for steel and coils
* interview started for FDC techs,
+ 5 interviews for 3 positions
Yi
* a week ago 13 samples irradiated at different temperatures
* damage among samples pretty close
+ 0 C sample had slightly higher damage
* recovery at 60 C faster
* at 0 C, recovery very slow
* after radiation, cooling helps still, but not as much as for
undamaged
Sasha
* comparison of dose with FLUKA: consistent with GEANT
+ at 1 MeV, factor of 1.5 lower; at 10 MeV, a bit higher
* dark current on tagger SiPM's a major concern
+ Richard looking at simulation
Lubomir
* Are electronics OK? Short answer: what we have now is OK
* pre-amps for cathode with gain of 2.6 mV/fC will work, but at lower
limit of this range, 0.9 next lower gain value
* anodes also have the lowest possible gain in their range, and are
in saturation
Fernando
* ready to purchase the ASIC's
* received more boards for the FDC
+ not all have arrived
+ Chris is checking them; they look good
* flash adc 250 boards have arrived, 3 boards, one to inspect, two
for assembly
Elliott
* first coil will go cold in mid Oct.
* internal coil configuration done soon
* B-field in test lab; some concerns from residents
+ at high field, not all walkways need to be cleared
* HMI coming along with Yi
* Hovanes taken over what Wesley was doing, EPICS
* will give notice to Cryo Group soon, they want two weeks notice
Elton
* suggests electronics show and tell for Lehman committee
+ 72 channel FADC
+ discriminator
+ some trigger board
Retrieved from
"http://www.jlab.org/Hall-D/software/wiki/index.php/Private:Hall_D_Staff_Meeting%2C_September_27%2C_2010"
More information about the Halld-jlab
mailing list