[Halld-jlab] Hall D Staff Meeting Notes, February 27, 2012
Mark M. Ito
marki at jlab.org
Mon Feb 27 19:24:03 EST 2012
People,
Find the notes at
https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_February_27,_2012
and below as text.
-- Mark
_____
Private:Hall D Staff Meeting, February 27, 2012
Present: Fernando Barbosa, Eugene Chudakov (chair), Cody Dickover,
Hovanes Egiyan, Nerses Gevorgyan, Mark Ito, Vanik Kakoyan, David
Lawrence, John Leckey, Lubomir Pentchev, Yi Qiang, Elton Smith, Sascha
Somov, Simon Taylor, Tim Whitlatch, Elliott Wolin, Glenn Young, Young
Man Working with Tim [Kwamei?]
Eugene, Announcements
* ETC
+ everything done from our side
+ 2.1 M$: original amount, 1.5 limit imposed, 1.6 was not close
enough
+ some things cut, things that we tried to add
+ some things cut from online
o no manpower to work on it
o some activities we can live without in first stages of
operation
+ spare solenoid pushed forward, cost escalated
* Elton on the ETC
+ additional layers of BCAL was added
+ stuff to complete solenoid included
+ installation realism added
+ fernando updated electronics plans
o pair spectrometer
o start counter
* Fernando on Future Items
+ most stuff accounted for already
+ power supplies for SiPM's perhaps will have to be added
* Tim on Future Items
+ most stuff covered
+ beamline downstream of FCAL may need attention
+ place holders added for air, nitrogen
+ for this year, 95% covered, approximately
* Eugene introduced Vanick Kakoyan
+ will be working on online tasks
Tim, Engineering
* Young Man introduced
* pair spectrometer vacuum chamber PR issued
* tagger vacuum chamber has been awarded
* due in in Sep.
* progress on tagger magnet
+ ultrasound done
+ steel being moved to final machining site
+ coils been delayed, they are at Everson-Tesla
* concrete in trenches, will be grouted soon
* FCAL platform: PR being prepared
* welding up copper/nitrogen shields for cryo tank
* start counter drawings being worked on
* TOF drawings being worked on
* can't finish welding LCW until Facilities completes their process
* power supply for solenoid moved to Hall
* mock up done, info extracted, designers looked at it Fri. morning
Fernando, Electronics
* If you plan to order power supplies, UPS's, or any electronic
equipment for the Hall, include Fernando in planning
* will send email on cabling
+ discussed labeling scheme in past
+ need to finalize cabling scheme
+ wants routing information for various subsystems, beginning
and ending points
* preparing for beam test
+ pair spectrometer electronics
+ mini-BCAL electronics
+ by end of week will be ready
* writing statement of work for testing FADC's and TDC's
+ Mark will be SOTR
* flash-125 will be tested here
* flash-250 board manufacturing at ACDI: iterating communication of
documents for fabrication
+ first article due in May, but should be here by end of March
* some assembly at UMass: LED lightguide, front panel, guide block,
heat sink, but no soldering
+ inspections on receipt
+ log serial number, look for broken parts
+ burn-in test, 1/2 hour
+ in VXS crate, full test
* discriminators
+ same company
+ have a dual lemo connector with long lead time, they ordered
already
+ April: first article
+ full order 70 modules for Hall D
+ Hall B will need "a ton of them"
* high voltage
+ should be here in May
* low voltage
+ have first articles
+ production pieces due next week
+ Weiner is behind
* cables should start arriving in Sep.
Cody
* F125 testing
+ working on test procedure
+ offset seen while testing pre-amps
+ digital output of ADC: some bits not connected during assembly
+ pulser output needs to be tested, never looked at
+ Lubomir asks about getting pre-production modules to use.
Fernando: should have all of them by the end of summer
* pre-amps
+ several assembled
+ Nick will help with testing
+ procedure has been streamlined
+ Lubomir: could not set high threshold on pre-amp
discriminator, 50 mV is highest possible
Hovanes
* ordered Dell server
+ now in EEL 126 eel, being set-up
+ for online testing, DAQ, controls, boot images for read-out
controllers, disk space for data
* ordered XPS motion controller from Newport
+ applications: collimator, tagger microscope, harp
* completed ETC things
+ pushed stuff from '12 to '13, '13 to '14, then some from '14
to '13
* Giles working on 480 V distribution plans
+ want to finalize positions of racks and power requirements of
each
* issue with L-shaped side of rack room:
+ only one side ventilated
+ Rebecca looked: both sides are connected, but to the same
module
* plan: deliver 208 from UPS and power panel to racks
+ 120 V may not be enough for a rack of servers
+ 208 V will go under the floor
+ Giles working on this as well
Elliott
* people working on solenoid
* precision current read-out scheme, internal sensor access, Mark
Stevens on it
* some things without RS-232 interfaces
+ Josh found a module that connects ethernet to PLC's
* gas system starting to come up
* have a design for diagnosing power supply trips
* break-out box between coils and instrumentation needed
* level of redundancy still to be decided
* coil tap read-out system in good shape
* Yi: loaner PXI system from NI, communication to PLC working well
+ sampling rate can be as high as few MHz, will go for few
hundred kHz
+ range from 1 to 300 V for maximum voltage
+ testing communication to epics
* Fernando comments on keeping track of modules
+ CED demo, based on Oracle last week
+ competing system in Hall B
+ gui-based systems
+ no need for these relational database system
+ Eugene: what about connection diagram info
+ Elliott: testing installation of both systems
* upcoming online meeting topics
+ trigger supervisor
+ SCONS
+ racks and power
Elton
* BCAL test preparations
+ BCAL U boards came in yesterday
+ light guides came in last week
+ looking at different wrapping for light guides
o tedlar
o acid-free paper
o no wrapping
o not much difference
+ issue of timing of getting the monitoring boards in, perhaps
will be here this week, could then be installed while gluing
+ meetings on electronics being held
+ put together in EEL 126 next week
+ aiming for middle of March
* Elton wondering about progress on George's spec of FMEA system for
solenoid
Sascha
* looking at FCAL prototype data
+ want to feedback to Sergey
+ need more data when beam comes back
* BCAL test preparations
+ implemented scalers in flash adc
+ working on graphical displays
+ Fernando: use 2 V jumper for BCAL
John
* remote scintillator counter, at 5% point being used now
* scintillators in front of array as well
* two other remote counters, not enough data in hand to calibrate
them
Mark
* TOF
+ meeting with FSU designers on Thu.
* Start Counter
+ going with 30 counters
+ going with 3 read-out boards
* Target
+ design meeting last week, progress made
* Offline
+ build on 64-bit RHEL box working after being down
+ single-track diagnostic job running on nightly build
+ DST output format decided
+ CLEO's EventStore being studied for use by GlueX
David
* CLAS-12 offline software review
+ they are preparing for review in June
+ work not yet integrated into coherent system
* working on BCAL simulations
+ putting full timing info spectra into HDGeant
+ still need to use this info in mcsmear
* walk-through with Michelle and Mark Stevens for open house
+ one bus stop: route through counting house, down to hall, back
to bus stop
+ will not include tagger hall
* still no charge or committee for software review
Simon
* slow forward-going protons a new area of study
* 15-20% problem in some areas, not enough good chi-squared tracks
Lubomir
* FDC production: working on third package
+ last week, installed first cell with new electroplating
procedure, held HV for 24 hours
+ also 2nd cell installed
+ all parts for 3rd package ready, more electroplating to do
* first package testing in EEL 126
+ efficiency issues
+ oxygen sensor reveals big fraction of O[2] in chamber
o 10x more than in leaky prototype (0.1%)
o 1% now
o lowest place has lowest[?] efficiency
o suspect that some places not flushing out
o higher flow rate will be tried
Yi
* SiPM production testing
+ calibrating light intensity
+ checking individual channels
+ some problems with connection boards
+ one of the sockets wider than spec
+ should start by end of this week
+ 1st goal: 88 samples (for use in BCAL test)
* did condensation test with no voltage
+ saw condensation on humid day
+ Eugene suggest set-up that can go to 5 degrees (nominal
operating temperature)
Nerses
* working on CAEN HV drivers