Private:Hall D Staff Meeting, March 12, 2012

    Present: Fernando Barbosa, Eugene Chudakov (chair), Kwame Coles,
    Hovanes Egiyan, Mark Ito, David Lawrence, John Leckey, Lubomir
    Pentchev, Elton Smith, Sascha Somov, Simon Taylor, Tim Whitlatch, Glenn
    Young, Beni Zihlmann

Eugene

      * work starts for the AWP
      * some restrictions for this fiscal year, cannot overspend the budget
      * need not sqeeze WBS-by-WBS, but sum must fit
      * two days left to do this
      * will be coming around to consult with individuals in charge of
        budget areas

David

      * software review
           + email sent soliciting work done and work anticipated from
             workers
           + another meeting this week on cross hall collaboration, called
             by Rolf
                o summaries of meetings sent out, some feedback from others
      * work on open house progresses
           + working on a new poster
           + lower-level poster than previous one, suitable for general
             public
      * BCAL simulation
           + have come a long way, but not done yet
      * getting software running on MacOS

Elliott (reported by David)

      * inventory system installed
           + some updates being added
           + a version is up and available
           + code is from Hall B, area for co-development

Fernando

      * readout for pair spectrometer prototype done
      * readout for BCAL test practically done
           + U-board being assembled, ready tomorrow
           + crate for biasing power supply ready to go
      * modules being procured
           + Cody is working on procurement for fADC-125's
                o Kathleen Jones has been contacted
                o PR should come out this week
           + fADC-250's are out for assembly
           + F1TDC also[?]

Hovanes

      * worked on new Linux server set-up, RedHat Enterprise Linux 6
           + fair size raid, for data
           + use as source of online software
           + CPU's can mount it and boot from it
           + EPICS installed
           + PXE booting not working yet
           + parititions
                o one large, not backed up
                o another for home areas, snapshot taken every night
                     # "back in time" [?] software used
                     # ten-week latency right now
      * Vanik Kakoyan getting up to speed with EPICS
           + prepared application for discriminators for BCAL beam test
           + other applications being worked on
      * Nerses
           + working on HV for CAEN supplies
      * Counting house
           + not much progress on UPS installation
                o waiting for Paul Powers to bring 480 power into rack room
                o Giles running this issue
           + power distribution for racks discussed
                o power limited by cooling, 62 kW, single chilling module
                o amount of power brought in: 400 A at 110 V plus double
                  that on UPS
           + Giles has specs on outlets desired
                o match to breakers, etc.
      * Fernando: UPS ordered without noise considerations considered
           + will not feed circuits in the Hall
      * Eugene wondered about a list of end-of-year purchases should funds
        become available

Elton

      * getting ready for mini-BCAL beam test
           + glued all light guides on
           + got LED boards from Athens, glued them on
           + light guides slightly over-sized, by about 1/2 mm
           + Scot measured all light guides, look slightly over-sized
           + go-no-go gauges may be needed
           + tooling jig also extends beyond edge a bit
           + Santa Maria making more light guides now
           + electronics ready by tomorrow
           + Carl Zorn and Yi Qiang working on testing SiPM's
           + start hooking up to DAQ on Wed.
           + LED controller board not yet in hand
           + one LED broke off

Beni

      * working in EEL 126 looking at oxygen in chamber
           + understand bubbler now
           + went to higher flow over the weekend
           + now a lot less oxygen, about 1%
           + chamber efficiency 90-100%
           + problem may be trapped pockets of oxygen
                o change operating parameters, pump on chamber
                o changes differential pressure between planes
                o no significant improvement proven
      * working on talk for DIS

Mark

      * meeting on start counter read-out board mechanical considerations
        with Tim, Chuck Hutton, Fernando
      * offline meeting: decided to use CLHEP as official package
      * working on a new sim-recon release

Tim

      * 2 weeks from now pole pieces for pair spectrometer magnet come in
      * nitrogen shield for solenoid cryo can done
      * grouted track for FCAL platform
      * vendor ordered materials for tagger vacuum chamber
      * pair spec vacuum chamber out for bid
      * Giles working on grounding plan in Hall
      * Giles also working on power distribution plan for Hall
      * collimator shielding design in progress

Simon

      * track finding
           + change in CDC: reduces false track candidates for
             configurations where tracks may share hits
           + straight track fitting being worked on

Lubomir

      * oxygen problem
           + coming from outside, via diffusion, against flow
           + o-rings suspect
                o foam core
                o try to increase compression
                o try aluminum rods instead of plastic, to take the tension
           + 1/2-cell dummy test chamber next to real one
                o 0.27% previously seen inside of test chamber
                o 0.7% seen after o-ring
           + will check oxygen in second package at Blue Crab
      * production
           + 3rd package, 3 cells installed, 3rd cell now working
           + tomorrow add 4th cell

Sascha

      * BCAL beam test work
           + running two FADC boards
      * pair spectrometer work
           + boards done
           + bring to hall
           + test with mini-BCAL
           + able to change thresholds, DAC levels remotely

John

      * working on FCAL beam test
           + over weekend, one adc missing in read-out
           + working not long ago
           + started working again after re-seating boards
           + second integrated Hall B run with tagger in read-out
                o Sergey Boyarinov will assist
                o on Thursday
                o electron energy will change from 120 to 250 MeV because
                  of beam energy change
           + cut off from Hall B after that

    Retrieved from
    
"https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_March_12,_2012"

-- 
Mark M. Ito
Jefferson Lab (www.jlab.org)
(757)269-5295



More information about the Halld-jlab mailing list