Private:Hall D Staff Meeting, May 7, 2012
Present: Fernando Barbosa, Eugene Chudakov (chair), Kwame' Coles, John
Domingo, Mark Ito, Vanik Kakoyan, David Lawrence, John Leckey, Lubomir
Pentchev, Elton Smith, Sascha Somov, Simon Taylor, Tim Whitlatch,
Elliott Wolin, Beni Zihlmann
Announcements, Eugene
* S&T review
+ spectroscopy talk: Eugene
+ SiPM talk: Yi Qiang
+ a yearly DOE review
* Hall D starts in Oct 2014
+ a delay with respect to previous schedules
+ Hall A starts a few months before that
* Open House
+ training today
+ we will set-up inside Hall D
+ we could put something by staging building
o need sign alerting people to existence of the Hall D
venue
+ to be shown:
o BCAL, 3 modules
o FDC exhibit
o standard posters
o Mini-BCAL, signals on scope
o construction movie
o event display projected on the solenoid
* long shutdown: mandatory meetings
* last month spending rate slipped by 400 k$
+ procurements took a step down
+ small procurements: some need to be turned to PO by end of May
* summer students
+ Elton asked about projects at the last meeting
+ if activities from which they can be paid, need to be
identified (can be software)
+ need a supervisor
+ plan is to have some from Regina, UNCW
Installation, Tim
* tagger magnet back on track, machining, coil making in progress
+ half of coils wound
* cladding delayed a month
* solenoid platform, design in review by Facilities, PR out by next
week
* tagger installation gantry in design, PR by next month
* installing baffle supports now
* BCAL tooling has arrived
* CAD training in progress, new CAD system being introduced
* power supplies
+ for tagger: identified 3 possibilities
o need to send to vendor for magnet testing[?]
+ for pair spectrometer: spec'ed, try to get PR out soon
+ for quad in tagger building: ordered
+ for small dipole: getting one from Accelerator
* Solenoid
+ by end of this month, move power supply into position
+ start work on that
+ outline of this work done
+ by August, up and running
+ controls should be on a similar schedule
+ Mark Stevens and Elliott proposed quench protection system,
will be reviewed by Giles and others, similar to system used
for tests
+ start cool down end of November, if all pieces here on
schedule
o no schedule slip thus far
Counting House, Hovanes
* main part of UPS installed
+ remote distribution cabinet not there yet
+ will be installed separately, separate charge from Facilities
+ needs to be scheduled
* Giles working on power distribution inside counting house, layout
of panels
* then plan routing of cables to racks
+ question: use Facilities or hire our own technicians?
* then run fibers from telecom room to counting house, can be done in
July
BCAL Test, Elton
* we have the mini-BCAL in Hall B
* initially in a position perpendicular to beam
* troubles with chiller, now resolved
+ rheostat broke down, now working
* moved to 20 degrees to beam, some data taken, more to come
* most of data needed for dynamic range issues in hand
* need to make a decision on the operating point,
+ 1.2 V above breakdown seems about right
* then need to tune electronic gain
* at 23% of 5.5 GeV
* another read-out board will be built
* Wed. will be last open time in schedule
+ second board will be ready, will try to install
+ 8 hours of beam studies scheduled
+ will have higher energy in new position
Electronics, Fernando
* BCAL: all channels have been tested on new board
+ Chris was checking bias settings to match upstream
configuration
* first-article discriminators have come in, Ben has checked one of
them
* should get first-articles of flash-250's this week
* sent equipment to UMass for testing set-up
* prototype flash-125's here, Cody loaded firmware
+ one sent to Gerard, he likes it so far
* prototype for f1-TDC V2 has arrived, high resolution version
+ Ed Jastrembski working on firmware, first level of testing
this week
+ then send out V3 for assembly
* pair spectrometer delayed by two months
* got first set of SiPM's in for start counter
+ design 95% complete
+ send files around sometime tomorrow
+ thermisters included in design
+ very confined space, between target vacuum chamber and CDC
+ need uniform air flow, from upstream of the target to
downstream
* receiving lots of cables, need to move stuff out of data center,
some shuffling of stuff
* final cable labels, due April 30
FDC, Lubomir
* 4 cells with new o-ring arrangement, oxygen very low
* did 4 cells at a time
+ testing done, channels look good
* easier to set high voltage on last three
* first one had issues with HV, tripping over weekend
* with oxygen lower less stable, may need another gas to stabilize
* plan to continue testing first cell
* turn it upside down[?]
* if things OK by end of week, two more cells
* in two weeks, package will be ready
* next: install grounding, material being ordered
* high-voltage wiring can be done without the grounding
FDC Testing, Beni
* noise helped by grounding, now 5 V rather than 13 V for control
voltage
* 2 mV peak-to-peak seen on scope for cathode strips
* added aluminum foil strips, all around periphery of chambers
* no progress on gas system
* efficiency plots look better in low-noise regime
* CMU folks found CDC connection wires slightly magnetic, not a lot
of force
FCAL, Elton
* working on production issues with CW bases, multi-prong approach
* issues with coating, corners of capacitors sometimes do not get
covered
Other Detectors, Mark
* FSU proposal for TOF constrcution has been reviewed, report sent to
Procurement
* UMass proposal for electronics testing has been reviewed as well,
report sent to Procurement
* TOF PMT purchase review, tomorrow
* start counter SiPM's arrived, 1/2 of order total order
Beamline, Sascha
* need to make decision on pair spectrometer detector
+ visually electronics looks good
* course counters: not much progress
* converter plan being formed
* microscope: have not seen electronics design yet
+ results promised at collaboration meeting
* SOW with Richard in Glenn's office
* need to proceed with procurement of scintillating fibers
* SiPM open question still, 25 or 50 microns
* SiPM performance results promised for collaboration meeting
* NMR for tagger magnet: will coordinate with Hall A guys, talked to
Tim
* goniometer: procurement moved to end of this fiscal year or the
beginning of next fiscal year, Ken waiting for quotes from Newport
* some meetings with Slava, discussed modifying shielding in
collimator cave
* trigger: waiting on beam tests to end
+ CTP in office
+ drivers exist, board exists, needs to be tested
Controls/Online, Elliott
* new CNU student next week, no word on more students as requested
* work on EVIO recently, some changes useful for monitoring farm
* how to monitor network switches? discussions with CNI
* barcode system: tech's want it
* getting ready to put stuff in inventory system
* Yi, Giles, Elliott met on PLX system
* FMEA work continues, George aiming for the end of the month
* construction on solenoid slow, manpower an issue
+ working on the break-out box
* lot of UPS applications in Hall, no Class B supplies available
* about to have an agreement with Accelerator (Bill Merz) to maintain
Danfysik power supplies
* we have a power meter on distribution in Hall
* Vanik presented XPS motion control system
* Josh is our PLC programmer, but only on until Jan.
Controls, Hovanes
* decided to buy some NIM bins
+ needed some for BCAL test
+ will buy from CAEN, 3 will arrive this summer
* put in order for terminal server
+ similar to Hall B's
* power strips for computer racks bought
* meeting with Weiner: discussed power supplies
+ planning document for high and low voltages transmitted
* Vanik working with XPS controller, from Newport, for goniometer
+ studying EPICS connection
+ procedures for scans and the like
+ can transmit what is learned to Ken Livingston
* will hold off on microscope bias voltage control
Software Review, David
* will have slides for all talks by end of week
* dry run during collaboration meeting
* working on documentation, deadline pushed back
+ want to have computing plan done by collaboration meeting
* working on revised numbers for computing needs
Tracking, Simon
* recoil proton reconstruction for eta proposal
+ found ways to improve efficiency for low-momentum protons
* 30-paddle start counter geometry from Puneet Khetarpal
+ interference with target design
+ being put into MC