Private:Hall D Staff Meeting, August 12, 2013

Eugene

      * Rebaselining
           + On Saturday, meeting at DOE HQ, a mini-review
           + approved, kind of
           + there may be some extra homework required
                o mainly other Halls' magnets
           + some kind of report may be needed as well
           + implies some extra work, but not much, for project plan
                o start with current schedule, subtract what we have
                  claimed
                o in Sep., look at entries in CostPoint and take those into
                  account
           + will try to get rid of "H" codes, activities that can only be
             marked as 0% or 50% or 100% done
           + Eugene will send a progress report today or tomorrow. We will
             still have to submit the normal end of month report as well.
      * Magnet
           + we need to understand the field map
                o specific area that shows 5%-ish discrepancy between
                  calculation and map, near coil #2 and end-plate
                o other areas agree to 1% of 1%
                o expected 90 degree phi symmetry of magnet due to
                  chimneys, see no such symmetry
           + some things need to be repaired
                o flow controller caused trips, needs fixing
           + long-term evaluation of some items
                o re-evaluate the temperature margins
                o T-dependence more rapid that that expected for this type
                  of cable
                o plan to test sort sample, need to use Dutch lab to do
                  work
                o need to work on the refrigerator
           + items from the test
                o there was a quench at 300 A, 8 K, during bottom filling
                o during ramp down before thunderstorm, big transient due
                  to rapid ramp rate, tripped
                o short comes and goes, caused trips

Beni

      * looking at having a single version of the firmware for FDC and CDC
      * Sascha reports that there are different versions for different
        detectors for the F250 firmware
      * Ed J. is working on a full crate test of the F125s

David

      * working on analysis from magnet mapping, discussion is on-going
      * online data challenge
           + scheduled for Aug. 26
           + re-factoring low-level digitization code to facilitate
             translation from geographical addresses to logical addresses
           + data will go into the ET, will be processed by level 3 trigger
             and monitoring processes on distributed nodes, then transfer
             to tape library
      * monitors are installed in counting house, should be powered by the
        end of the day
      * working on finalizing F125 data format
      * attended meeting on workflow tools and data provenance
           + Chip called meeting, develop system for managing large-scale
             processing tasks
           + David and Mark will be on initial committee

Sergey

      * inventory database working well
      * need to merge Hall D database and private version
      * not all electronic labeled, labeling needed before insertion into
        database

Simon

      * working on track finding
           + segment matching
           + matching between FDC and CDC
           + hit selection improvements implemented
      * working on some FOM issues for the level 3 trigger

Mark D.

      * Getting oriented: reviewing CODA, EVIO, discussing topics with
        other staff

Sascha

      * Working on TOF trigger algorithm for level 1
      * Looking further at FADC scalers
      * Reviewing specification for BCAL trigger, with a separate threshold
        for each module
      * Eugene: FCAL and BCAL triggers will be needed soon. Sascha: BCAL
        easy, FCAL work required
      * UConn waiting on ferrules for microscope
      * diamond radiator has been added to UConn contract
      * working with Roman on server-client system for trigger debugging;
        allows boards to be read-out without DAQ
      * course-grained pair spectrometers assembled by UNCW students, 18
        done and tested
      * fine-grained pair spectrometers construction continues, 86 1 mm
        tiles done 180 2 mm tiles, all done in 1.5 weeks
           + Anatoly moved from Blue Crab to ESB to TEDF, but will be
             kicked out by Hall B personnel

Lubomir

      * Blue Crab hectic getting ready for move
           + material being moved to a variety of places
      * last week connecting 1/4 of FDC
           + very dense, especially around the first package
           + additional rails used for mesh that were not originally
             anticipated, causes access difficulties
      * on Wed. will move FDC to EEL 126
           + some cables stuck to rails during practice detector insertion;
             5 HV cables came loose
      * In EEL 126, 2 scintillator paddles from test area will be used for
        trigger

Elton

      * BCAL
           + modules: gluing finished
           + cradle on upstream platform
                o 1/2 stacked, will be done this week
                o will be surveyed this week
                o then re-shimmed
           + magnet vacuum leaks will have to be fixed before insertion
           + still some modules in ESB, target group wants the space, spare
             module will remain there for testing
                o Tara working on new pulser system
      * Indiana and Regina contracts end this month
      * Zisis working on technical papers, on on monitoring system, the
        other on MPPC characterization work at Regina
      * Expecting visitor from Santa Maria. Need place for him to sit
      * FCAL helium poisoning check done, no problem seen
      * waiting for parts from IU for floor of dark box

Yi

      * solenoid testing
           + high-speed data being analyzed
                o there was a black-out issue when there were fast
                  transitions
                o these triggered the quench detector
      * goniometer
           + plan to move to FEL soon
           + new student working on it: Ziheng Chen
      * will be going to Argonne to look at microchannel plate detector
        development effort, will give seminar as well, dry run next week

Fernando

      * new CAEN modules: all modules need to be logged
      * full-crate tests: TDC and Flash-125 are still to be done in F112
           + some VXS crates will need to be recalled
      * cabling bundling and labeling is done; in ESB ready for
        installation
           + students have left
      * 9 crates in counting house will go to Hall soon
      * power to racks in Hall by the end of this month, then can turn on
        FCAL and BCAL
      * need to organize cabling crews
      * assembly being done at UConn on microscope electronics (without
        SiPMs)
      * BCAL readout boards nearly done (2 or 3 more to go)
      * start counter SiPMs will soldered in this week, boards hopefully
        done by end of month
           + Nick will go to FIU to get them started with read-out
      * pair spectrometer read-out electronics will be done by mid-Sep.

Nerses

      * nearly finished with driver for HV and LV
           + putting them into the final application
      * problem with driver for communication with Weiner crates, Hovanes
        has a solution
      * Vanik almost done with GUIs
           + able to enable and disable individual channels
      * working with Beni to evaluate needed functionality

Patrizia

      * P: when is the party? E: Wed. at 3 pm

    Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_August_12,_2013"

-- 
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295



More information about the Halld-jlab mailing list