Present: Fernando Barbosa, Eugene Chudakov (chair), Mark Dalton,
Hovanes Egiyan, Mark Ito, Vanik Kakoyan, David Lawrence, Lubomir
Pentchev, Sergey Pozdniakov, Yi Qiang, Dmitry Romanov, Sascha Somov,
Simon Taylor, Ivan Tolstukhin, Elliott Wolin, Beni Zihlmann

=Eugene=

* We are about 10% behind schedule since the re-baseline in September.
** All money will be gone by October
** Helped by early procurement of computers
** FCAL and tagger magnet officially complete, budget codes ca not 
longer be used
** mostly installation activities remaining
* budget only good through Jan. 15
** hope that a budget is forthcoming
* restructuring: no new news
* tagger magnet: on Fri. an issue with control of the power supply
** have not started measurements yet

=Fernando=

* pair spectrometer: both arms tested by Ivan
** resolution looks good
** publication coming out of this work
* power in Hall
** checked for upstream platform and racks close to wall (CDC and FDC)
** north and south platforms are next, south ready to go , but power not 
on yet
** other racks after that, under platform...
* All BCAL hardware installed
* CDC: LV and HV cabling complete
** gas flowing
** test done this morning, noise, signals look good
*** 2.5 mV rms at output of pre-amp
*** at 2000 V, over 500 mV signals
*** 2100 V is the target
** performing survey of temperature on pre-amp cards
*** will be used to plan cooling configuration in Hall
** ready for tests with FADCs
** then move to Hall, should then be done in a week or two
* cell phone repeaters in Hall
** peaks at 900 MHz and 1.8 GHz observed in Hall
** wireless access point also installed in Hall, but should be at 2.4 GHz
** Elliott will look into the situation

=Beni=

* setting up gas system to run over the break
** Lubomir will check the system from time to time

=Dmitry=

* working on the trigger database framework
* making preparations for new release of CCDB, version 0.09

=David=

* working on the data format specification for the Flash 125
** Cody will start by implementing the Flash 250 format
** New specification is for version 2
** Naomi working on the algorithm for extracting times
** Hai will work on the F-250, will help Cody with the F-125
** pedestal value will take a third word initially
* JANA 0.7.0 preliminary tag exists
** changes may have implication for farm failures
* user references:
** support mcsmear with different random number generators for each thread
* ODC-2014
** working on the document
** schedule in May during check-out activities
** Sascha: needs to be coordinated with the trigger
* set-up facility for gluon cluster
** change local versions of various packages
** Elliott: ROC development environment is an example of alternate set-up
** Sascha: need to get support from DAQ guys for software packages and 
libraries

=Sergey=

* working on configuration files for boards
** want them to be general and understandable
** working on CAEN 1290 TDC
** F-250 and VME discriminator already done
* keeping inventory database up-to-date
** will put in network devices from Bryan Hess

=Hovanes=

* LV and HV implementation for the FDC
** HV works in general, a few items left
*** ramping issues
*** requests from Lubomir
** exploring having faster control for voltages, especially ramp-down
*** communications the limiting factor at present
*** a meeting will be called
* motors
** Vanik implementing tagger microscope support structure control
** addition of encoders induce vibrations

=Sascha=

* CDP got new firmware, checking with SSP
* working on FCAL crates, read them all out
** issues with data consistency, some bank lengths wrong
** also sync issues, usually with the TS crate

=Ivan=

* pair spectrometer, 2 arms tested
** similar results, gain variation less than 2%
** all channels working
** stacked all scintillator tiles together
* aluminum mounting plate and fibers next
*** procedure for Anatoly to do this written
* making dark box for use in January
** then assemble the whole detector

=Mark D.=

* working on conference proceedings
* ODC
** timestamp problem between TI master and slaves
*** perhaps due to algorithm for accounting for length of fibers
* new CODA release: some discussion on how his will be done

=Elliott=

* ODC milestones achieved
** CODA source release
** Farm Manager test
** read-out list using MC data (Mark D.)
* mods to BMS: read-out lists, ROCs
* network switches all in but one, that one by end of week
** powering them up
** Brent prepping them
* fiber contract drawings reviewed
** Jason from FM running it
* terminal servers: all but one in
** not all parts for cables on hand
* Becky: TLD rack in Counting House will be there in January
* database meeting with Computer Center, implementation will be done 
this week
* /gluex/cool code management an issue
* controls:
** solenoid cool-down planning will start with meetings in January
** Eugene: may go to nitrogen temperature in May
*** need implementation of remote control features
* Hovanes: what is needed for PXI system
** Yi: how archiving goes needs to be discussed

=Mark=

* Offline
** changes to decay chain reporting checked-in
** single-track reconstruction, multi-day issue solved
** started adding new calibration constants, from program organized by Sean
** Johann Goetz working in a scheme to plot calibration constants as 
function of run number
* TOF
** requested a no-cost extension from Procurement
** main C-channels due in today, no counter installation until next month
* Start Counter
** carbon fiber support layer, 3 layers of fiber now
** material implications discussed
** yield of counters at Eljen improving
* served on slow controls review committee for Heavy Photon Search in Hall B

=Lubomir=

* all LV cables connected
** LV panel connected temporarily
** all connections tested
* HV control system test driven, some minor features requested
* HV cabling has damage risk
** start disconnected from panel
** want to check connections
** takes one day per packages, started today
* continue with signal cables next year
** signal cables relatively easy on the detector side
* shielding blocks installed in the Hall, need TLDs now
* cooling system working for a week now
** minor problem, impedance higher than expected but no unacceptably so

=Simon=

* alignment: turn to the FDC
** exploring whether z-position of planes can be mapped
* Justin requested wire-based tracking on a selected tracks in an event 
for BDT

=Yi=

* working on document of goniometer testing
* BCAL reconstruction
** BCAL BDT work, for cluster ID
*** start with Will's cuts, put in other parameters
** work on developing table of calibration constants for BCAL
** BCAL reconstruction curvature effect
*** starting with Andrei and Irina's simulation results
** Giovanni or another Regina student may help
* worked on SLAC DIRC bar box proposal
** submitted last Monday
* worked on EIC R&D proposal for a dual radiator/RICH detector
** with Carl, Patrizia, LANL, INFN, others[?]
** will test microchannel-based read-out (LAPPD), baseline read-out for DIRC
** submitted last Fri.
** will travel to BNL do defend

=Vanik=

* leaving Friday
* tagger microscope control
** 3 motors, coordinated movement a complication
** some drivers functions needed to be written
** worked on motor testing problems mentioned by Hovanes
* working on GUI for control of power supplies for FDC, CDC

=Configuration Control Document=

* Elton circulated a draft, please review
* one page per system for now

-- 
Mark M. Ito, Jefferson Lab, (757)269-5295, marki at jlab.org