[Halld-jlab] Hall D Staff Meeting Notes, March 10, 2014
Mark Ito
marki at jlab.org
Wed Mar 12 12:30:33 EDT 2014
Peoples,
Find the notes below and at
https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_March_10,_2014
-- Mark
____________________________________________
Private:Hall D Staff Meeting, March 10, 2014
Present:
Present: Fernando Barbosa, Eugene Chudakov (chair), Mark Dalton,
Alexandre Deur, Hovanes Egiyan, Sergey Furletov, Mark Ito, David
Lawrence, Lubomir Pentchev, Yi Qiang, Sergey Pozdniakov, Dmitry
Romanov, Patrizia Rossi, Elton Smith, Sascha Somov, Simon Taylor, Tim
Whitlatch, Glenn Young, Beni Zihlmann
Announcements, Eugene
* JLab is a no-passing zone. Do not pass golf carts on road at the
Lab.
* Patrizia had asked for an accounting of radiologically activated
material in the Hall. They are:
1. cryo heat exchanger
2. green shielding blocks
* Project items
+ February saw a big bounce back in progress for Hall D
o CPUs came in
o many online tasks closed
+ we are at a positive cost variance but a negative schedule
variance
o spending that advances the schedule should be considered
+ "Lehman" review coming in a month
o dry runs for pre-review start this week
+ some accounts have been closed, a more detailed map of what to
charge to will be sent out
* accelerator schedule:
+ running next year will likely be 20 weeks less that we would
like
+ due to budget and work with magnet cooling systems in the
machine
* solenoid
+ there have been problems with refrigerator repair
+ a "spare" refrigerator from SLAC has been delivered
+ cost has risen in any case
* October run
+ may start as early as October 10, must end by December 15
+ we will run for three weeks, nominally
Installation, Tim
* pair spect. magnet mapping waiting for OSP
+ fiducialized
* gas system testing/troubleshooting in 1 or 2 weeks
* electricians in Hall all week
+ Joe Beaufait point of contact
* Narisco has come back on board
* contract designer job in works to help with paperwork
* tagger vacuum window formed
+ lead found, perhaps at O-ring
* many other items, too numerous to mention at this meeting
Beni
* read 2 DCs with 50 k events
+ fixed 104 sample window
+ data makes sense
+ running larger sample now
+ Cody reprogramming all ADCs in Hall
* last week, TDC read-out was broken
+ debugged with Bryan, 3 of 4 crates now working
+ needed update to firmware on TI
+ by tonight will try to read-out FDC
* working on problem with reconstruction code
+ analyze data, number of positive and negative tracks changes
+ Simon working on same problem. See reproducibility for
REST-plugin-only running
FDC, Lubomir
* Thu. of last week, problem with FADCs, so started testing with
scope
+ can do one package per day
+ by Fri., tested two packages
o 5 bad channels found and fixed
+ package 3 has about 37 bad channels
o some of these new (strips only)
o problems related to conductive tape
o work started on fixing these, about half done
+ 4th package, 15 channels bad
+ need frame to pull cables along with chambers
* CDC testing, Beni
+ will start to get ready to move to Hall
+ new ring installed
+ also additional mounting straps for gas manifold on the ring
Calorimeters, Elton
* 2 weeks ago started turning on BCAL
+ most modules shorting, would not come up to voltage (75 V)
+ had conductive sleeve, shorting out wires
+ 1 to 1.5 days spent cutting out all sleeves, they were not
needed
+ most channels came up, signals checked on about half of ADC
cables
+ 3 modules still tripped
o 1 still had sleeve
o 1 had cable issue
o 1 had shorted cable, Chris found it after it was brought
back to F117
+ upstream modules only checked so far
+ almost ready for DAQ checking
* chiller has been operating for 10 days with no issues at 18 C
+ 3 temperature read-outs have problems (of 48)
+ humidity has been low
* FCAL read-out activity
+ using LEDs and pulser
+ 100 problem channels identified, 20 fixed so far
Trigger, Sascha
* new CODA release, 3.0.1
+ new features work
+ can set configuration files with run control
* got 2 FADC crates running
Sergey F.
* many people using the hdsys account
+ things change without attribution
+ things are sometimes in unpredictable locations
* mix of scripting/shell languages: Tcl, Expect, Python, tcsh
* templates from CODA group need update in some cases
* working on organization, setting of environment variables
+ Sascha: with control from run control, a large number of
global environment variables are no longer needed
Sascha
* config. files for BCAL need to be finalized
* global trigger crates (GTP, TS, TI) installed
* for FCAL and BCAL, 6 crates each are connected to global crates
* libraries are needed from Bryan for switching clock source
* this week: global trigger distribution
* Chris will do cable length measurements
* BCAL test scintillators are in the Hall
+ Hai has implemented cosmic trigger for BCAL using FADC
Electronics, Fernando
* F125
+ Cody found a bug where the header and trailer check would get
out of sync
+ fixed now
+ should be enough boards for FDC and CDC
+ doing full crate test in Hall
+ after that Cody will turn to working on port of F250 code
* BCAL connectors
+ sleeve an extra part
+ should not have been installed
* tagger microscope
+ PR for mini-racks submitted
+ order for supplies for power and bias
o was originally 10-12 weeks delivery
o now 15-16 weeks
* gamma (beam) profiler
+ all cables and pars are in
+ should be ready in a month
* extra procurement for F125
+ QA feedback to company made
+ everything fixed except last 9
o they cannot be fixed they will not charge us
+ will procure another 25 new from a different company
* Sascha/Glenn: CTP
+ 3 are bad
+ more have been ordered
Beamline, Alexandre
* pair spectrometer mapping read; waiting on signatures on OSP
+ survey has been done
+ reproducibility of probe position is good
+ do not have a calculated filed map yet
o Sasha Glamazdin is working on it
* commissioning target
+ we had a meeting on design: Eugene, Mark I., Simon, Alex
+ design basically done
o tube attached to start counter support
o targets attached to another tube inside that
o CH2 or carbon targets
* cryotarget review first week of May
* spare cryotarget?
+ used at LEGS
+ belongs to INFN Rome
+ will discuss use with Annalisa D'Angelo
+ there may be problems meeting modern code
* Sascha: pair spectrometer detector fabricated, loaded on coupling
plate
+ waiting for electronics box
Solenoid, Yi
* PXI system returned to manufacturer, back now
* software mods, added timesteps so PLC can synchronize
* implementing EPICS IOC for fast DAQ
* re-established PLC archive
+ database is large, 700 GB
* communication with Danfysik
+ sent all graphs, in their re-org documents were lost, need to
resend
* pair spectrometer magnet control is done by ACC
* radiator stepper motor
+ checked FEL set-up
+ all components working
+ will put together test stand
* need field by end of August
+ start cooldown in June
+ George making improvements, coming slowly
Controls, Hovanes
* Controls meeting
+ Orlando showed pulser control for FCAL
* UPS
+ in tagger hall, Joe Beaufait has idea to locate in service
building
+ in hall, requirements almost done, apart from solenoid control
* meeting with ACC on software
+ tagger magnet control developed, test with connection to power
supply next
* installed voltage control for BCAL in Hall
* temperature read-out in PLC working, need to connect to EPICS
* chiller shut-off will trigger power cut-off to FDC
* voltage control for CDC in EEL building set-up
David
* working on online data challenge
* setting up general CODA test facility
* working on start and stop scripts using Sergey P.'s as example
* Open House Programming Committee met; mark May 17 on your calendars
* Graham buying more computers for batch farm
* working through Elliott's property list, searching for computers
* meeting on logbook held
+ Brad Sawatsky had some ideas
+ please funnel feature requests through David
Simon
* working on preparations for data challenge, tracking down new
issues
* working on alignment
+ in Fall, for no field, how much data is needed
+ at low magnet current what can we do
Sergey P.
* keeping track of all electronics
* implemented mobile version of Hall D database
+ can scan and modify
* adding ROCs to remote reboot script
Dmitry
* working on trigger database
* discussion last week on a unified database, work will likely be
deferred
* killed a few bugs in the CCDB
* run control communication discussion with CODA people, got example
XML
+ will try to run this week
Yi
* LDRD
+ 3 proposals accepted last year
+ will submit a proposal for microchannel plate read-out
Workshop η Physics, Eugene
* η → 3π: implication for light quark masses, g-2
* η → π^0 π^0: CP violation
* η → π^0 γ γ: chiral perturbation theory
* competitors: KLOE, Crystal Ball
Mark
* Computer Center will double the number of farm nodes for our data
challenge
* badge rack will be installed in counting house
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_March_10,_2014"
--
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295