Hall D Staff Meeting, October 31, 2016
Present: Alexander Austregesilo, Thomas Britton, Eugene Chudakov, Mark
Dalton, Hovanes Egiyan, Mark Ito, David Lawrence, Paul Mattione,
Patrizia Rossi, Elton Smith, Sascha Somov, Simon Taylor, Tim Whitlatch,
Beni Zihlmann
Announcements, Eugene
* Staff position decision made, names to HR
* Patrizia: we have money for period up to Dec. 9
Engineering, Tim
* goni is here
o install by this week, will be under vacuum
o according to manufacturer: problems when operated in a small
range, need to move over full range occasionally
o need to re-lube once per year
* target still retracted, but ready to put back in
* comp cal had to be resurveyed, mistake in y, 1.7 mm
DAQ, Sascha
* feature: F125 threshold, fixed by Cody, caused mismatch with config file
* new firmware installed for FDC
* new discriminator firmware, allow bi-polar thresholds
o backward compatible, old software will work
* tagger trigger: bit assignments correct, no more VXS backplane problem
* firmware upgraded, link, flash CTP,...
o Hai and Ben working problem
* global processing firmware for flash
o trigger energy flow
o stable right now
o minor feature, wrong computation
o working on correcting feature
* after discriminators, will start cosmic run
* FADC in reasonably good shape
* high lum., 1 TDC, new firmware
o Eugene: Sergey Furletov tested with fast link on a crate
o F1 TDC not at high rate yet
* Comp cal, Chris connect power supply
o problems with batteries
o look with scope, new PS installed
o will check all channels and booster supplies
o read of FADCs
o next week cosmics
Production, Alexander
* 2 monitoring launches
1. for time calibration
2. checks
o Mike Staib found discrepancies in geometry
o Simon: further correction needed in x, some undoing in y
* waiting on geometry for reconstruction launch
o timing calibration fixed
o hopefully this week
* many new farm nodes at CentOS7
o started testing over weekend, many failures
o good availability though
--
marki at jlab.org, (757)269-5295
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-jlab/attachments/20161031/37ed7c52/attachment.html>
More information about the Halld-jlab
mailing list