Hall D Staff Meeting, July 24, 2017
From Gluex PRIVATE Wiki
Present: Alexander Austregesilo, Thomas Britton, Eugene Chudakov
(chair), Mark Dalton, Hovanes Egiyan, Mark Ito, David Lawrence, Paul
Mattione, Lubomir Pentchev, Elton Smith, Steve Smith, Simon Taylor
Contents
* 1 Safety Culture Survey, Steve
<https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Safety_Culture_Survey.2C_Steve>
* 2 Hall Status, Eugene
<https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Hall_Status.2C_Eugene>
* 3 Carbon Dioxide Switch-Over Valve, Lubomir
<https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Carbon_Dioxide_Switch-Over_Valve.2C_Lubomir>
* 4 Analysis Launches and Software, Paul
<https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Analysis_Launches_and_Software.2C_Paul>
* 5 PAC, Eugene
<https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#PAC.2C_Eugene>
* 6 Run Readiness
<https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Run_Readiness>
* 7 Hall B Ready-for-Science Review, Elton
<https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Hall_B_Ready-for-Science_Review.2C_Elton>
Safety Culture Survey, Steve
* results of the latest survey were presented
* survey conducted 2 months ago
* already presented to the Director's Safety Council
* questions were different this time
* two big take-aways:
1. schedule pressure has led to unsafe practices
2. line management not supporting workers, not requiring worker
accountability
* see Steve's slides for all the details, including statistical
breakdown of results
Hall Status, Eugene
* Tim sent in some items
* DIRC frame due to appear in August
o water purification system due to arrive at same time
* magnet cooling starts mid-August
* August 10, UPS battery replacement scheduled, allegedly non-disruptive
* heater went off in the Hall, temperature dropped, recovered now
* field in the permanent magnet in the tagger area checked, no change
* budget extremely tight (operations)
o for rest of FY, only spending to support upcoming run
* GWU hiring new postdoc to be resident at JLab: Stuart Fegan
Carbon Dioxide Switch-Over Valve, Lubomir
* new valve not as good as the old
o no manual switch-over capability
* Josh did the last change over by manually re-plumbing the lines
* old valve being readied to back into service
Analysis Launches and Software, Paul
* Alex A. reports that the reconstruction launch for Spring 2017 data
is finished, including post-processing
o 120 TB of REST data
o 40 TB of coherent skim data
* Analysis Launch being prepared
o 40 channels
o resulting trees about 40% of REST data volume
o experimenting with cuts to reduce footprint
o goal is to start Friday
* Analysis Library software: improvements in speed, memory usage
o still some memory leaks
o if ready by Friday, will switch over to new library
PAC, Eugene
* JEF approved with no dedicated time, will run with GlueX
o replacement of inner calorimeter needs to be scheduled
o if central FCAL becomes damaged, new inner calorimeter a
possible replacement
* K_L : PAC wanted more coherent proposal with more detail
* Nuclear targets: PAC wants to combine the proposals, not clear how
to do that
* PVPDF, Mark D.: question on quantifying improvement
Run Readiness
* David: new disk for DAQ system, bids due tomorrow
* Hovanes: goni survey done, one axis a bit off
o next: move to tagger hall, re-survey
Hall B Ready-for-Science Review, Elton
* Elton, David, and Beni Zihlmann on committee
* convene just before run, end of September
* internal review
--
Mark Ito, marki at jlab.org, (757)269-5295
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-jlab/attachments/20170724/9f195d2f/attachment.html>
More information about the Halld-jlab
mailing list