[Halld-jlab] Hall D Staff Meeting Notes, July 24, 2017
Mark Ito
marki at jlab.org
Tue Jul 25 15:18:37 EDT 2017
Find Steve's slides on the Safety Culture Survey at
https://halldweb.jlab.org/talks/2017/PHY%20April%202017%20rev1.pptx
They are also linked from the notes on the private wiki now.
On 07/24/2017 04:51 PM, Mark Ito wrote:
>
> Please find the notes below and at
> https://halldweb.jlab.org/wiki-private/index.php/Hall_D_Staff_Meeting,_July_24,_2017
>
> __________
>
>
> Hall D Staff Meeting, July 24, 2017
>
> From Gluex PRIVATE Wiki
>
> Present: Alexander Austregesilo, Thomas Britton, Eugene Chudakov
> (chair), Mark Dalton, Hovanes Egiyan, Mark Ito, David Lawrence, Paul
> Mattione, Lubomir Pentchev, Elton Smith, Steve Smith, Simon Taylor
>
>
> Contents
>
> * 1 Safety Culture Survey, Steve
> <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Safety_Culture_Survey.2C_Steve>
> * 2 Hall Status, Eugene
> <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Hall_Status.2C_Eugene>
> * 3 Carbon Dioxide Switch-Over Valve, Lubomir
> <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Carbon_Dioxide_Switch-Over_Valve.2C_Lubomir>
> * 4 Analysis Launches and Software, Paul
> <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Analysis_Launches_and_Software.2C_Paul>
> * 5 PAC, Eugene
> <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#PAC.2C_Eugene>
> * 6 Run Readiness
> <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Run_Readiness>
> * 7 Hall B Ready-for-Science Review, Elton
> <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Hall_B_Ready-for-Science_Review.2C_Elton>
>
>
> Safety Culture Survey, Steve
>
> * results of the latest survey were presented
> * survey conducted 2 months ago
> * already presented to the Director's Safety Council
> * questions were different this time
> * two big take-aways:
> 1. schedule pressure has led to unsafe practices
> 2. line management not supporting workers, not requiring worker
> accountability
> * see Steve's slides for all the details, including statistical
> breakdown of results
>
>
> Hall Status, Eugene
>
> * Tim sent in some items
> * DIRC frame due to appear in August
> o water purification system due to arrive at same time
> * magnet cooling starts mid-August
> * August 10, UPS battery replacement scheduled, allegedly non-disruptive
> * heater went off in the Hall, temperature dropped, recovered now
> * field in the permanent magnet in the tagger area checked, no change
> * budget extremely tight (operations)
> o for rest of FY, only spending to support upcoming run
> * GWU hiring new postdoc to be resident at JLab: Stuart Fegan
>
>
> Carbon Dioxide Switch-Over Valve, Lubomir
>
> * new valve not as good as the old
> o no manual switch-over capability
> * Josh did the last change over by manually re-plumbing the lines
> * old valve being readied to back into service
>
>
> Analysis Launches and Software, Paul
>
> * Alex A. reports that the reconstruction launch for Spring 2017
> data is finished, including post-processing
> o 120 TB of REST data
> o 40 TB of coherent skim data
> * Analysis Launch being prepared
> o 40 channels
> o resulting trees about 40% of REST data volume
> o experimenting with cuts to reduce footprint
> o goal is to start Friday
> * Analysis Library software: improvements in speed, memory usage
> o still some memory leaks
> o if ready by Friday, will switch over to new library
>
>
> PAC, Eugene
>
> * JEF approved with no dedicated time, will run with GlueX
> o replacement of inner calorimeter needs to be scheduled
> o if central FCAL becomes damaged, new inner calorimeter a
> possible replacement
> * K_L : PAC wanted more coherent proposal with more detail
> * Nuclear targets: PAC wants to combine the proposals, not clear how
> to do that
> * PVPDF, Mark D.: question on quantifying improvement
>
>
> Run Readiness
>
> * David: new disk for DAQ system, bids due tomorrow
> * Hovanes: goni survey done, one axis a bit off
> o next: move to tagger hall, re-survey
>
>
> Hall B Ready-for-Science Review, Elton
>
> * Elton, David, and Beni Zihlmann on committee
> * convene just before run, end of September
> * internal review
>
> --
> Mark Ito,marki at jlab.org, (757)269-5295
>
>
> _______________________________________________
> Halld-jlab mailing list
> Halld-jlab at jlab.org
> https://mailman.jlab.org/mailman/listinfo/halld-jlab
--
Mark Ito, marki at jlab.org, (757)269-5295
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-jlab/attachments/20170725/7b91be76/attachment.html>
More information about the Halld-jlab
mailing list