[Halld-jlab] Hall D Staff Meeting Notes, August 6, 2018
Mark Ito
marki at jlab.org
Mon Aug 6 17:22:49 EDT 2018
Folks,
Please find the notes below and by clicking here
<https://halldweb.jlab.org/wiki-private/index.php/Hall_D_Staff_Meeting,_August_6,_2018>.
-- Mark
___________________________________________
Hall D Staff Meeting, August 6, 2018
From Gluex PRIVATE Wiki
Present: Alexander Austregesilo, Thomas Britton, Eugene Chudakov
(chair), Mark Dalton, Hovanes Egiyan, Sergey Furletov, Mark Ito, David
Lawrence, Patrizia Rossi, Sascha Somov, Beni Zihlmann
* Announcements (Eugene)
o CHL2 down
+ transformer failed this morning, switch made to CHL1
+ can run 4 K for both linacs
+ spare transformer was out for repair, will be delivered tomorrow
o FY18 budget has arrived
+ can spend against it now
+ ordering 70 k$ of FADC-250s
+ thinking about spare parts for crates
o New accelerator associate director: Andrei Seryi
+ New deputy: Mike Spata
o 2K cold box in final review
+ installation in 2020, 6-7 month down period
o Solid detector cost estimate in: approx. 60 M$
o Cooling water repair done today
+ Beni: successful
# Upstream BCAL chiller had problem, replaced, new one
won't turn on
+ FM hoped for bad cable as root cause of water problem
# if not got to alternate scheme until winter
o DIRC optical box delayed, due in Aug. 12
+ Plan: fill with water, leak check
+ schedule very tight
* Preparations for Run
o long list of items from Tim
+ cryo box on magnet almost empty, but refrigerator started
+ solenoid HCO on Wed.
+ vacuum by 8/17
* Sergey
o old and new file servers in hand
o waiting for Sascha's work to complete before switching
* Sascha
o last week cosmics taken
+ new ROCCDC1 did not work, reverted firmware to old version
+ ran BCAL cosmic trigger
o working on new firmware for DIRC SSP
+ firmware like Hall B RICH
+ having library compatibility problems
+ trying to unify libraries with Ben Raydo
+ trigger SSP needs modification
o ready to start the run
o DIRC: special crate, optical connection there
+ lacks SSP read-out
+ LED system going in, CAEN 1495 used to drive LEDs
+ will be ready for run
o CompCal
+ 10 FADCs in crate, connected to read-out
+ Needs connection to trigger system, Ben will do that after
finishing DIRC
+ CAEN 1495, LED system installed
* Sergey
o Plan is to move to new file server
o will test new high-performance CODA
o also working on C version
* David
o computers restarted today
o new run period set up
o GUIs on workstations lock up under RHEL7
* Hovanes
o gluon29, host of soft IOCs, crashed
o won't start, moved IOCs to gluon30
o may have to re-arrange applications, alarm server was running there
o David: seems really dead, two PSs for redundancy and neither works
o gluon49 is also dead, but that happened a long, long time ago
* Beni
o chambers: turning them on, communication with HV an issue,
problems restoring voltages
+ Hovanes: IOC host ran out of memory today
o BCAL LV crate failed, PS replaced, no more spares
+ everything back on
o TAC removed from Hall
+ in EEL, Ashot Gasparian will take a look at it
+ goes back to Hall 7/14
o Lubomir Pentchev checked FDC before his vacation, sees signals
o left a set of voltages to use
* Mark D.
o took data with BCAL, SiPMs working
o need chillers to work
o FCAL: Colin Gleason has 20 bases to replace
* Alex A.
o full reconstruction of 2016 and 2017 underway
o using LQCD nodes on loan, and new nodes purchased for farm
o 80% of 2016 done, all of 2017 workfest
o analysis launch started on workfest data
o last week: 500 bad jobs, got only 2 GB of 20 GB input file
transferred, only 1% of total processing
o will start complete 2017 in next few days, should take 20 days
o running 800 jobs at a time now (no new nodes at present)
* Mark I.
o sim-recon git repository split into two separate repositories
last week
o no major problems so far
* David
o NERSC test: Chris Larrieu back, want to get beyond 20 jobs at a
time
+ limited by disk space
+ goal: monitoring launch on 2018 Spring data
+ outgoing bandwidth of only 100-200 MB/s seen
* Sascha
o CompCal to Hall, need to schedule move
o 120 of 140 modules assembled
o frame will be ready by end of month
o Hovanes: movable stage tested at high level by Vanik
* Hovanes
o CompCal, DIRC controls will have to be done during 3 week break
in Nov.
o Other controls in good shape
o will work on gluon29/30 today
o Vanik coming: will fix CompCal GUI, test motion system
o DIRC: work for Vanik
+ HV system: no GUI yet
+ LV system: there is a bug, no GUI yet
# MPOD lost to spare pool
+ water and gas system done by Nick Sandoval
+ request for readout of temp for each board, scalers for each
channel
# will need working system to develop these
* Beni
o solenoid PXI needs looking at
* Sascha
o 2 pair spect. channels fixed
Retrieved from
"https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_August_6,_2018&oldid=5714"
* This page was last modified on 6 August 2018, at 17:20.
* This page has been accessed once.
--
Mark Ito, marki at jlab.org, (757)269-5295
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-jlab/attachments/20180806/13a80cf9/attachment.html>
More information about the Halld-jlab
mailing list