[Halld-level1] Hall D - TOF crate
Alexander Somov
somov at jlab.org
Thu Apr 17 14:24:28 EDT 2014
Hi David,
You can use roctof1 crate; we've installed boards with
Sergei. Other crates you'll need are roctrig1 (TS) and
roctrig2 (GTP)
Cheers,
Alex
On Wed, 16 Apr 2014, Chris Cuevas wrote:
> Hi,
>
> The Hall D TOF crate is ready to be connected for a DAq test.
> We relocated one of the fiber patch panels from the FCAL south
> to the FCAL north. (Rack: D2-1)
>
> The two fiber patch cables are installed for the TI, CTP and labeled.
> We noted that the CTP, TI and CPU were not installed in the TOF crate,
> so once those are installed and configured, we can test using the Global
> and TS crates. The TI-D and SSP fiber ports are connected and are ready
> for the TOF TI and TOF CTP.
>
> Thanks,
> -Chris
> ~~~~~~~~~~~~~~~~
>