Hi Beni,
Thanks for checking the setup.
Alex and/or Beni: Is it possible to take a little date with the new connection and copy the file to /cache so that I can look at it? At the moment a few hundred events is all I need for initial debugging.
Thanks, Elton.
------------------------------------
Elton Smith
Jefferson Lab MS 12H3
12000 Jefferson Ave STE 4
Newport News, VA 23606
(757)269-7625
On Aug 27, 2021, at 12:33 PM, Beni Zihlmann <zihlmann at jlab.org<mailto:zihlmann at jlab.org>> wrote:
followup:
after closer inspection it turns out that the second connector on the ADC input is broken and
does not properly engage with the cable connector. I connected the second signal cable to
the 4th channel of the ADC.
attached you also see a picture of the second scintillator below the wire chamber that
only needs to be connected to HV and signal cables. And a coincidence established
with the upper scintillator.
cheers,
Beni
On 8/27/21 12:20 PM, Beni Zihlmann wrote:
Hi All,
1) found that the lemo cable that was supposed to be connected to channel 2 was lying on the ground.
I reconnected it to channel 2. Channel 1 was and is still connected.
2) gas bottle has been replace already. I turned the flow back on at about 0.05l/m
3) I installed the second scintllator underneath the table. It only needs to be connected with HV and
signal cables.
cheers,
Beni
_______________________________________________
Halld-npp mailing list
Halld-npp at jlab.org<mailto:Halld-npp at jlab.org>
https://mailman.jlab.org/mailman/listinfo/halld-npp
<scintill.jpg>_______________________________________________
Halld-npp mailing list
Halld-npp at jlab.org<mailto:Halld-npp at jlab.org>
https://mailman.jlab.org/mailman/listinfo/halld-npp
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-npp/attachments/20210827/38f8ab6e/attachment.html>
More information about the Halld-npp
mailing list