[Halld-npp] Wire chamber test status
Beni Zihlmann
zihlmann at jlab.org
Fri Aug 27 12:33:07 EDT 2021
followup:
after closer inspection it turns out that the second connector on the
ADC input is broken and
does not properly engage with the cable connector. I connected the
second signal cable to
the 4th channel of the ADC.
attached you also see a picture of the second scintillator below the
wire chamber that
only needs to be connected to HV and signal cables. And a coincidence
established
with the upper scintillator.
cheers,
Beni
On 8/27/21 12:20 PM, Beni Zihlmann wrote:
>
> Hi All,
>
> 1) found that the lemo cable that was supposed to be connected to
> channel 2 was lying on the ground.
> I reconnected it to channel 2. Channel 1 was and is still connected.
>
> 2) gas bottle has been replace already. I turned the flow back on at
> about 0.05l/m
>
> 3) I installed the second scintllator underneath the table. It only
> needs to be connected with HV and
> signal cables.
>
>
> cheers,
> Beni
> _______________________________________________
> Halld-npp mailing list
> Halld-npp at jlab.org
> https://mailman.jlab.org/mailman/listinfo/halld-npp
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-npp/attachments/20210827/46008ff0/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: scintill.jpg
Type: image/jpeg
Size: 505390 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/halld-npp/attachments/20210827/46008ff0/attachment-0001.jpg>
More information about the Halld-npp
mailing list