[Halld-npp] Wire chamber test status
Beni Zihlmann
zihlmann at jlab.org
Fri Aug 27 12:20:08 EDT 2021
Hi All,
1) found that the lemo cable that was supposed to be connected to
channel 2 was lying on the ground.
I reconnected it to channel 2. Channel 1 was and is still connected.
2) gas bottle has been replace already. I turned the flow back on at
about 0.05l/m
3) I installed the second scintllator underneath the table. It only
needs to be connected with HV and
signal cables.
cheers,
Beni