[Halld-offline] Calibration job update
Sean Dobbs
s-dobbs at northwestern.edu
Mon Apr 11 22:22:57 EDT 2016
Dear all,
The latest set of calibration jobs over runs 11048 - 11145 has finished up,
and a new set of jobs covering runs 11150 - 11312 is hitting the farm.
As a reminder, besides skims, the jobs also generate outputs for a wide
range of calibration plugins. For a detailed description of the plugins
and outputs,see the following wiki page:
https://halldweb.jlab.org/wiki/index.php/Calibration_Train
Cheers,
Sean
On Wed, Apr 6, 2016 at 5:51 PM Sean Dobbs <s-dobbs at northwestern.edu> wrote:
> Dear all,
>
> The first set of calibration jobs, running over the 5mm collimator data
> taken before the long accelerator down time have finished.
> The results can be found at
> /volatile/halld/home/gxproj3/calib_jobs/GlueX-CalibRun-2016-03-18
> and the skim files at
> /cache/halld/home/gxproj3/calib/GlueX-CalibRun-2016-03-18
>
> As a reminder, we are creating skims for pi0 calibration, TOF calibration,
> and for gamma p -> p pi0 events.
>
> The second set of jobs, covering the 3.4 mm collimator data taken recently
> have been started. The first two passes have finished, and the final step
> is underway, with skim files being created.
> The results can be found at
> /volatile/halld/home/gxproj3/calib_jobs/GlueX-CalibRun-2016-04-04
> and the skim files at
> /cache/halld/home/gxproj3/calib/GlueX-CalibRun-2016-04-04
>
>
> Cheers,
> Sean
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-offline/attachments/20160412/17d386e4/attachment-0002.html>
More information about the Halld-offline
mailing list