GlueX Start Counter Meeting, July 12, 2012
Minutes
Present:
* FIU: Lei Guo
* JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Puneet
Khetarpal, Tim Whitlatch, Beni Zihlmann
Prototype News
Werner Boeglin has ordered a single sheet of scintillator from Eljen,
76 mm×3 mm×60 cm. It will be sent to McNeal as raw material for five
counters.
Chuck will produce new drawings to the McNeal can make the correct
shape. This will be important so the new counters register well with
the new SiPM boards.
Read-Out Design
Nick Sandoval reported to Mark that the some channels of the boards
have been populated and basic tests have started. See the images below.
Note that the SiPM's had not been soldered on when these photos were
taken.
image:read-out board
Image:read-out board with cables
Two of the 50 micron and two of the 100 micron SiPM's have been
attached to boards. The 50 micron channels look good so far. Some
adjustments to the 100 micron channels are underway.
Simulation
Puneet has started HDGeant simulations to repeat the studies done by
Sascha Somov for the new geometry. He is working with Sascha to
validate his results now.
He also has an idea for how to do give the scintillator volume
different reflective properties on different faces in his Geant4 light
collection simulation. He was able to consult with the experts while
attending this week's Geant4 Tutorial at JLab.
Contract
Mark sent a copy of the TOF Statement-of-Work to Werner as an example
for FIU.
Mark also put together an Advanced Procurement Plan (APP) using nominal
time periods for the various steps. It shows the contract being awarded
in February 2013. No money can be sent directly to FIU without a
contract. We will quite likely have to go faster than the APP shows.
Retrieved from