[Halld-pid] Start Counter Meeting Minutes, April 4, 2013
Mark M. Ito
marki at jlab.org
Thu Apr 4 15:33:49 EDT 2013
Find the minutes below and at
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_April_4,_2013#Minutes
.
_____
GlueX Start Counter Meeting, April 4, 2013
Minutes
Present:
* FIU: Werner Boeglin, Eric Pooser
* JLab: Mark Ito (chair), Beni Zihmann
Announcements
Mark talked to Youri Sharabian about how he bent the scintillator for
the CLAS start counter. Turns out he had Eljen do all of the shaping of
the bars, both bending and milling of the edges. His contact at Eljen:
Chuck Hurlbut.
Construction News
Scintillator Manufacturing
Eric reported that Eljen has finished manufacturing five counters with
a precision bend. Chuck Hurlbut explained the procedure:
* Clamps of polished aluminum are used.
* Scintillator is heated 2 inches beyond bend region.
* The clamp is heated as well.
* The system allowed to cool, enough to handle.
* The scintillator bar is turned on its side and placed on a surface
with a drawn line that indicates the proper shape and then allowed
to cool for 24 hours.
* If the bar does not hold its shape, heating and clamping is
repeated.
Eljen has internal discussions on packaging the bars for shipment. They
will apply a clear light-tack adhesive film to all of the counters. The
idea is to leave this film on the broad surfaces while the edges are
machined at McNeal.
Eric is waiting to see if McNeal has received the bars. In the
meantime, he has been discussing minor details on the contract with
them including packaging and handling procedures. The total cost for
the complete detector should be about 4 k$.
Test Stand
Eric walked us through [21]drawings of the stand designed for
acceptance testing of incoming scintillator bars. There is a fixture
with a Sr source and trigger scintillator that can be moved to
reproducible positions along the scintillator under test. There is also
an [22]XYZ motion stage to hold the SiPM detectors. The entire
structure will be inside a dark box.
Eric would like to have the stand constructed and working before the
five bars arrive from McNeal. Machining will be done in the FIU shop by
Carlos Ortega.
Contract
Ludmilla Ettiene sent the technical proposal to JLab Procurement. The
terms and conditions are still being worked on at FIU. Sponsored
Research has received comments from Legal, but nothing major. Werner
has been asked to respond to a few questions. JLab should recieve the
complete package by next week sometime.
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_April_4,_2013"
References
21. https://halldweb1.jlab.org/talks/2013-2Q/Test_stand.pdf
22.
https://halldweb1.jlab.org/talks/2013-2Q/Newport_XYZ_Translation_Stage.JPG
--
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295
More information about the Halld-pid
mailing list