[Halld-pid] Start Counter Meeting Minutes, April 4, 2013
Mark M. Ito
marki at jlab.org
Thu Apr 4 15:49:33 EDT 2013
Correction:
The insured value for the package of 5 bars is about 4 k$ (not the total
cost).
On 04/04/2013 03:33 PM, Mark M. Ito wrote:
> Find the minutes below and at
> https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_April_4,_2013#Minutes
> .
> _____
>
> GlueX Start Counter Meeting, April 4, 2013
> Minutes
>
> Present:
> * FIU: Werner Boeglin, Eric Pooser
> * JLab: Mark Ito (chair), Beni Zihmann
>
> Announcements
>
> Mark talked to Youri Sharabian about how he bent the scintillator for
> the CLAS start counter. Turns out he had Eljen do all of the shaping of
> the bars, both bending and milling of the edges. His contact at Eljen:
> Chuck Hurlbut.
>
> Construction News
>
> Scintillator Manufacturing
>
> Eric reported that Eljen has finished manufacturing five counters with
> a precision bend. Chuck Hurlbut explained the procedure:
> * Clamps of polished aluminum are used.
> * Scintillator is heated 2 inches beyond bend region.
> * The clamp is heated as well.
> * The system allowed to cool, enough to handle.
> * The scintillator bar is turned on its side and placed on a surface
> with a drawn line that indicates the proper shape and then allowed
> to cool for 24 hours.
> * If the bar does not hold its shape, heating and clamping is
> repeated.
>
> Eljen has internal discussions on packaging the bars for shipment. They
> will apply a clear light-tack adhesive film to all of the counters. The
> idea is to leave this film on the broad surfaces while the edges are
> machined at McNeal.
>
> Eric is waiting to see if McNeal has received the bars. In the
> meantime, he has been discussing minor details on the contract with
> them including packaging and handling procedures. The total cost for
> the complete detector should be about 4 k$.
>
> Test Stand
>
> Eric walked us through [21]drawings of the stand designed for
> acceptance testing of incoming scintillator bars. There is a fixture
> with a Sr source and trigger scintillator that can be moved to
> reproducible positions along the scintillator under test. There is also
> an [22]XYZ motion stage to hold the SiPM detectors. The entire
> structure will be inside a dark box.
>
> Eric would like to have the stand constructed and working before the
> five bars arrive from McNeal. Machining will be done in the FIU shop by
> Carlos Ortega.
>
> Contract
>
> Ludmilla Ettiene sent the technical proposal to JLab Procurement. The
> terms and conditions are still being worked on at FIU. Sponsored
> Research has received comments from Legal, but nothing major. Werner
> has been asked to respond to a few questions. JLab should recieve the
> complete package by next week sometime.
>
> Retrieved from
> "https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_April_4,_2013"
>
> References
>
> 21. https://halldweb1.jlab.org/talks/2013-2Q/Test_stand.pdf
> 22.
> https://halldweb1.jlab.org/talks/2013-2Q/Newport_XYZ_Translation_Stage.JPG
>
--
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295