[Halld-pid] Start Counter Meeting Minutes, January 24, 2013
Mark M. Ito
marki at jlab.org
Tue Jan 29 10:30:41 EST 2013
Find the minutes at
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_January_24,_2013#MinutesGlueX
and below.
___
Start Counter Meeting, January 24, 2013
Minutes
Present:
* FIU: Werner Boeglin, Puneet Khetarpal, Eric Pooser
* JLab: Chuck Hutton, Mark Ito (chair)
Contract
The proposal from FIU is past due. On the other hand, Mark has
exchanged email with Jarrod Fitzpatrick, and this situation seems less
than dire. Werner thinks that he can come up with a draft Procedures
and QA plan by Monday. Mark agreed to review the plan.
Counter Construction
Eric is in contact with Chuck Hurlbut at Eljen and Robert McNeal (at
McNeal) and is getting quotes on their respective construction steps.
The cost from McNeal should be about the same as for the previous
prototypes.
Werner asked about cables for testing the counters. Mark told us that
his understanding is that JLab will supply the cables. Mark will
confirm that with Fernando. We decided that we would make a tentative
plan to try to test all thirty counters at once at FIU. That will drive
plans for lending electronics and for manufacturing cables in advance
of installation in the Hall.
Eric reported that Eljen is suggesting that we use EJ-200 rather than
the EJ-212 we had planned for originally. We will order five counters
initially, with height and width of 3 mm × 30 mm before machining.
Including the cost of practice runs, it should come out to about $200
per counter. Eljen says that once the order has been placed, the
counters can be manufactured in a matter of days.
Chuck Hutton will ask around and see how folks at the Lab have made
sure that vendors adhere to the required shipping standards.
Assembly Drawings
We looked at a set of drawings Chuck has done with the final dimensions
of the start counter support structure.
* [17]Foam Cone Assembly
* [18]Inner Foam Cone
* [19]Foam Cone Ring
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_January_24,_2013"
References
17. https://halldweb1.jlab.org/talks/2013-1Q/1001.pdf
18. https://halldweb1.jlab.org/talks/2013-1Q/2001.pdf
19. https://halldweb1.jlab.org/talks/2013-1Q/2002.pdf
More information about the Halld-pid
mailing list