[Halld-pid] Time-of-Flight Meeting Minutes, January 27, 2021
Mark Ito
marki at jlab.org
Wed Jan 27 19:37:51 EST 2021
Folks,
Please find the minutes here
<https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_January_27,_2021#Minutes>
and below.
-- Mark
_____________________________________________
GlueX TOF Meeting, January 27, 2021, Minutes
Present: Eugene Chudakov, Mark Ito (chair), Sasha Ostrovidov, Susan
Schadmand, Beni Zihlmann
There is a recording of this meeting
<https://bluejeans.com/s/8GZxYxK2JpK/>. Log into the BlueJeans site
<https://jlab.bluejeans.com> first to gain access (use your JLab
credentials).
Review of minutes from the last meeting
We went over the minutes from January 13
<https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_January_13,_2021#Minutes>
without significant comment.
PMT Repair
* Prompted by Sasha's question at the last meeting, Beni checked on
the HV settings of the tubes that are candidates for replacement. He
found that they are all on the low side, 1210 to 1290 V. Based on
that, he thinks that we should replace only two of the PMTs (PMTs 69
and 113) rather than the five he identified last time.
* Sasha reminded us that all of the single-ended, new-in-TOF-II
modules have the end surface near the beam hole blackened.
* Sasha told us that Paul Eugenio is willing to come up to the Lab to
do the replacement, but the required two-week quarantine makes that
impractical.
* The tubes will be replaced in situ (no need to remove the entire
array from the forward carriage).
* Beni proposed practicing PMT replacement on one of the unused
modules in the Hall.
* Mark suggested that as we learn how to do the replacement, we also
train a member of the technical staff on the task.
TOF II Trigger
Beni ran down the activity in progress on standing up a trigger with TOF
II.
* We want to present progress at the CPP/NPP readiness review.
* Hai Dong told Beni that all changes necessary to support the TOF II
geometry can be done in the crate trigger processor (CTP). Nothing
upstream of the CTP need be modified.
* Hai has written up a work plan. Elton presented it at the CPP
meeting this morning.
o The work will take 4 weeks.
o 2 to 3 weeks will be needed for bench testing.
o Sascha Somov will have to test the system in the Hall after
that, either with cosmics or (most likely) with beam.
* The plan puts us on track for having the system ready for beam tests
before the August run.
* Beni and Mark will meet to confirm channel assignments as
transmitted to Hai. Mark has the map that was used to create
translation tables that have worked in recent data taking.
TOF NIM paper
No known progress.
Action Item Recap
1. Decide on when to ship PMTs to JLab from FSU (Mark, Paul Eugenio)
2. Prepare a complete draft of the TOF NIM paper. (all)
3. Make a plan for TOF repair during the SAD, including Paul in the
discussion. (all)
4. Renew the equipment loan agreement between JLab and FSU (Mark, Paul)
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20210127/242d3d51/attachment.html>
More information about the Halld-pid
mailing list